Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-09-16 Planning & Organisation Committee Agenda

of 141

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          16 September 2014


    ENGINEERING
          Site Access and Driveways
    6.    A sealed access driveway must be provided from Edward Street for the full
          length of the proposed access easement. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular:
          a.   A 3m wide sealed access extending from the end of the current formation
               in Edward Street to the property boundary,
          b.   A 4m wide sealed access for the full length of the proposed access
               easement including a 5.5m wide passing bay located between the Edward
               Street frontage and the access to Lots 1 and 2,
          c.   Sealed access driveways to Lots 1 and 2 extending from the edge of the
               shared access driveway to the boundary of Lots 1 and 2, and
          d.   Underground service conduits for all utility services.
          Stormwater Drainage
    7.    The site must be provided with a stormwater drainage system connecting to a
          lawful point of discharge. The works must be undertaken in accordance with an
          Operational Works approval and must include in particular:
          a.   An interallotment drainage system extending from the boundary of Lot 1 to
               James Street;
          b.   the use of gravity stormwater drainage.
          Electricity and Telecommunication Services
    8.    Reticulated electricity and telecommunication services must be provided to each
          lot in accordance with an approval for Operational Works and the standards and
          requirements of the relevant service provider.
    9.    Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits
          and pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    10.   Certification must be submitted to Council from all relevant service providers
          which certifies that the development has met the requirements of this Decision
          Notice and all applicable legislation at the time of construction.
          Easements
    11.   An easement for drainage purposes must be registered against the title of
          proposed Lot 2 in favour of Council over the land area identified as being below
          the 1%AEP flood level on the subject site.
    12.   For the purpose of this permit the 1%AEP flood level means the 1%AEP level as
          described in a current Flood Certificate issued by Council.
    13.   An easement for access and services purposes must be registered against the
          title of the Lot 3 SP155477 in favour of proposed Lots 1 and 2. The easement
          must be located generally in accordance with the approved plan and have a
          minimum width of 10 metres.
    14.   An easement for interallotment drainage must be registered against the title of
          proposed Lot 2 in favour of proposed Lot 1. The easement must extend from the
          common boundary of Lots 1 and 2 to the James Street frontage.




                                                                              Page 95 of 145
Log in to download the original file

2014-09-16 Planning & Organisation Committee Agenda(PDF, 16MB).pdf · 16.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.