2008/2063
Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer
and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s street drainage system
at any one location is 25 litres/second.
31. As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path
that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge
stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these
properties.
32. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
33. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
34. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
35. The development shall be served by individual water meters to each tenement and be capable
of being separately rated.
36. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
37. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
38. Filling works required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses. Detailed site surveys indicating natural surface levels and contours of the
adjoining properties must be provided with the application for a Development Permit for
Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
39. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7DB3.001.pdfRelated documentPublic source context ↗
SUPERSEDED Negotiated Decision Notice - 010.2008.00002063.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 80 KB (small file)
- File type
No other editions are linked here.