2008/2063
Site Stability
40. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
41. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
42. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $ 1,438
PSP16 – Sewerage Headworks Contributions $ 2,023
PSP17 – Water Supply Headworks Contributions $ 2,386
PSP20 – Pathway Trunk Network Contributions $ 323
TOTAL Contribution Amount = $ 6,170
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from December 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
43. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
44. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001A7DB3.001.pdfRelated documentPublic source context ↗
SUPERSEDED Negotiated Decision Notice - 010.2008.00002063.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 80 KB (small file)
- File type
No other editions are linked here.