SEAHAVEN REDEVELOPMENT

Hastings Street Noosa Heads

Dated — 10.01.09 4

Response to council information request

Item 18

Anticipated Construction Period

1.
2.

Demolition = 16 weeks
Construction = 64 to 72 weeks

Anticipated Traffic volumes ae +

1.
2.

Demolition = 13 trucks per day
Construction

for 90% of the time = 10 trucks per day
for 10% of the time = 5 trucks per day

Anticipated impacts and mitigation measures

Noise — Measures to minimise impact as follows:-

1.
2.
3.

Working hours kept strictly to Council approve days and hours of work

Tower Crane to be Electric. IE: Not Fuel driven

Piling will be methods requiring minimal vibration which will be monitored by a
qualified Soil Engineer :
Hutchinson Builders shall take all practicable precautions to minimise noise
resulting from work activities. Equipment shall be fitted with noise suppressors
when appropriate and available and used so that noise in public areas is
minimised and complies with the Occupational Health and safety Noise
Regulations — 1992 and EPA Noise Control Guidelines.

Effective noise and vibration management strategy will be achieved by continual ;
Communication by all parties. Establishment of a dynamic response process, *
which allows for the adjustment of control methods and criteria for the benefit
of all parties. The affected parties directly adjacent to the work will be contacted
on a regular basis and kept informed of the progress of the site and measures 4
taken to minimise Noise and vibration. Where loud activities and generation of .
high noise levels are unavoidable, early notification will be given to the
representative of ail adjacent residence and Businesses. Consultation in all areas
of noise management will be undertaken with affected parties.

Used in these records

About this file

File size
24.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1787 - Response to Information Request [As Published].pdf · 24.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.