Page 2 Dust— Measures to minimise impact as follows:- 1. A program of dust suppression PVA sprays and water to be applied as required preventing dust from leaving the bounds of the site. 2. To mitigate dust emissions the use of water where practicable will be used when:- > Loading out, Transporting and dumping scrap onto stockpile. Travel roads and dumping are will be watered down to prevent dust generation. This will be achieved by using a water truck and pumps and sprays > Conducting construction and deconstruction works, before during and after. We will at all times wet down structures and surrounding areas as much as practicable. Hand tools with dust extraction facilities will be used where possible 4. Shade cloth to the entire perimeter boundaries of the site, to a minimum height of 1 metre above roof height, will be erected and maintained during the Structural and external finishes trades of construction. 5. Any minor soil leaving the site to the street, will be removed with out delay by way of mechanical street sweepers 6. Regular onsite clean up will be adopted not only as good house keeping, but is required to a high standard by Work Place Health and Safety Legislation. 7. Hutchinson Builders will at all times endeavour to minimise dust emissions and continually monitor the effectiveness of dust mitigation strategies. w 4 §
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1787 - Response to Information Request [As Published]Related documentApplication case desk ↗
0019DFEA.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 24.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.