Council archive · source document
08/1787 - Response to Information Request [As Published] · 132008.1787
Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Page 4 . d) Trucks wishing to enter the site are required to contact the Project Manager to arrange access to site. Drivers will remain in their vehicle at a location specified, until they are informed of or * escorted to the correct site entrance. e) During the Project the Project Manager and other site personnel will constantly review and assess whether changes need to made to routes taken by vehicles to ensure the safety of and minimize disruption to the public and businesses. Visual impacts — Measures to minimise impact as follows:- 1. The visual impact of the site works will be managed by good house keeping of the Hoardings and Gantries and the shade cloth to site perimeter scaffold. 2. The Hoardings and Gantries be erected in a professional and Tradesman like manner and will have paint finishes maintained. The Shade cloth will be new when installed and be erected taut and maintained in an aesthetically pleasing condition. It is a company policy of Hutchinson Builders, to take pride in the appearance of all of our building sites and all of our Building sites look neat and tidy promote a professional image. too an ord Pedestrians— Measures to minimise impact as follows:- 1. Hutchinson Builders have identified that specific public protection and exclusion controls needed to be implemented throughout the duration of this project. That is, control measures will be implemented at the site to warn members of the public and neighbours of the site activities and , exclude them from entering the construction area and to prevent from a being exposed to the risk of illness or injury. To achieve adequate public protection and exclusion zones, Hutchinson Builders will undertake the following: Erect a hoarding fence on the propose line boundaries where exclusion is deemed necessary 2. The hoarding will be supported by metal supports that are to be fixed with ' additional incline bracing and supports (F brackets or star pickets secured ‘ to fence panels), where required, to ensure the hoarding cannot easily SO, j topple or collapse. 4 . The hoarding will be erected in the approximate locations as specified on the above boundaries, and contain lockable gates to allow worker, vehicle and machine access. s Installed and maintained to manufactures specifications . The condition and placement of the hoarding fence will be monitored on an ongoing basis, and during documented site inspections by the site team member. j
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1787 - Response to Information Request [As Published]Related documentApplication case desk ↗
0019DFEA.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 24.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.