Skip to the record
Accept no substitutions.

Council archive · source document

08/1787 - Response to Information Request [As Published] · 132008.1787

of 96

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Site/building stability

23. Please provide comment from a suitably qualified geotechnical/structural engineer with
regard to the site location and the possible affects of wave action and water inundation
in a major storm event.

Response: Correspondence prepared by Coffey Geotechnics is attached in Appendix H regarding the site
location and possible affects of wave action and water inundation.

Sewer

24. It is noted that a Council sewer main traverses the development site. The development
plans show buildings located over the sewer. Provide plans showing buildings designed
clear of the Council sewer within the development site, or a diversion of the sewer. A
sewer diversion will require plans and longitudinal sections of the diverted sewer, the
relationship to the proposed building and an easement over the sewer in accordance
with the Noosa Plan - Planning Scheme Policy No. 6. Please note that No buildings or
structures are permitted to be located within a sewer easement.

Response: Plans prepared by Construction Hydraulic Building Service Engineers are attached in
Appendix I showing a solution for diversion of the sewer, should the approved redevelopment of 33
Hastings Street not occur first, which would then result in the sewer in question becoming redundant.

Stormwater

25. There is a discrepancy between the architectural plans and the stormwater management
plans with regard to the location and extent of the retention and detention tanks. Please
provide consistent plans.

esponse: The attached architectural plans and stormwater management plans in Appendix I provide
for a consistent location of the retention and detention tanks.

Works

26. Confirm that separate male & female shower / change facilities and lockers will be
provided for staff.

Response: Separate male and female shower/change facilities will be provide for staff generally as
detailed on drawing no. sk2000.

27. Demonstrate that the ramped public access path along the western boundary is
compliant with the Disability Discrimination Act.

Response: The ramped public access path along the western boundary will be compliant with the
Disability Discrimination Act. Drawing no. sk2000 shows grades not exceeding 1:14 in accordance with
the disability code. This matter is also subject to further detailed design and subsequent Operational
Works application and will require Council assistance to make good the grades.

wow

Used in these records

About this file

File size
24.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1787 - Response to Information Request [As Published].pdf · 24.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.