response to further advice request 41 picture point · RAL22/0021
3. Provide documentation that the area was lawfully cleared in accordance
with the Noosa Plan.
4. Provide a Bushfire Management Plan that details the required setbacks to
the pre-cleared vegetation for the existing dwelling.
5. Provide a plan detailing proposed building envelopes for the site that with
regard to bushfire hazard.
Please find attached the detailed further advice response by Urban Catalyst 3 dated 28
November 2022 addressing the requirements of the exempt clearing works for bushfire
protection under the Planning Regulation 2017, Nature Conservation (Protected Plants)
Regulation 2020, Vegetation Management Act 1999 and The Noosa Plan 2020.
6. Provide a preliminary stormwater management plan for the site. The plan
must be prepared by a Registered Professional Engineer of Queensland
and consider the future construction on the site.
7. Provide a geotechnical report that address the development of the site, the
current soil conditions, the potential impacts of on-site disposal of
stormwater and includes recommendations for the future development on
the lots.
8. Provide written advice from Unitywater in regard to their preferred option
for the realignment of the sewer main.
Please see attached a Stormwater Management Plan, Geotechnical Report and
associated engineering plans which addresses items 6, 7 and 8 of the information request.
Figure 4 – Illustrative depths for piled footings.
Page 7 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to further advice request 41 picture point.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.