RFI - Att 4 - Stwtr Mngmt Plan
Plans and drawings: the text below has words only, no drawings.
Rational Method Calculations
Project 221304
Address 23 Coral Tree Avenue By DK
Pre - Development Post - Development
Catchment Details Catchment Details
Area 0.0607 ha Area 0.0607 ha
fi 0.43 fi 0.62
C10 0.78632619 C10 0.82355848
I10 74.9 mm/hr I10 74.9 mm/hr
Standard Inlet Time Standard Inlet Time
Time 5 mins Time 5 mins
Overland Sheet Flow (Friend's Eqn) Overland Sheet Flow (Friend's Eqn)
Length m Length m
Slope % Slope %
Surface 'n' Surface 'n'
Time 0 mins Time 0 mins
Pipe Flow Travel Time Pipe Flow Travel Time
Flow Distance m Flow Distance m
Fall of Channel m Fall of Channel m
Time mins Time mins
Kerb Flow Kerb Flow
Length m Length m
Slope % Slope %
Time 0.0 mins Time 0.0 mins
Channel Flow (Figure 4.8 QUDM, or Channel Flow (Figure 4.8 QUDM, or
Manning's Equation) Manning's Equation)
Flow Distance m Flow Distance m
Fall of Channel m Fall of Channel m
Time mins Time mins
Adopted Time of Adopted Time of
Concentration
5 mins Concentration
5 mins
Pre-Development Peak Discharges Post-Development Peak Discharges
Design Storm Frequency
Area (ha) Cy Iy (mm/h) Qy (m3/s) (AEP) Factor (Fy)
Area (ha) Cy Iy (mm/h) Qy (m3/s)
0.0607 0.62906096 125 0.013 63.20% 0.80 0.0607 0.65884679 125 0.014
0.0607 0.66837727 157 0.018 39.35% 0.85 0.0607 0.70002471 157 0.019
0.0607 0.74700988 196 0.025 18.14% 0.95 0.0607 0.78238056 196 0.026
0.0607 0.78632619 226 0.03 10% 1.00 0.0607 0.82355848 226 0.031
0.0607 0.8256425 258 0.036 5% 1.05 0.0607 0.86473641 258 0.038
0.0607 0.90427512 300 0.046 2% 1.15 0.0607 0.94709226 300 0.048
0.0607 0.94359143 331 0.053 1% 1.20 0.0607 0.98827018 331 0.055
Discharge Comparison
AEP 63.20% 39.35% 18.14% 10% 5% 2% 1%
Difference 0.001 0.001 0.001 0.001 0.002 0.002 0.002
Percentage 7.7% 5.6% 4.0% 3.3% 5.6% 4.3% 3.8%