Original source · versioned page text
RFI - Att 4 - Stwtr Mngmt Plan
Plans and drawings: the text below has words only, no drawings.
Rational Method Calculations
Project 221304
Address 28 Banksia Avenue By DK
Pre - Development Post - Development
Catchment Details Catchment Details
Area 0.0647 ha Area 0.0647 ha
fi 0.00 fi 0.75
C10 0.7 C10 0.85
I10 74.9 mm/hr I10 74.9 mm/hr
Standard Inlet Time Standard Inlet Time
Time 5 mins Time 5 mins
Overland Sheet Flow (Friend's Eqn) Overland Sheet Flow (Friend's Eqn)
Length m Length m
Slope % Slope %
Surface 'n' Surface 'n'
Time 0 mins Time 0 mins
Pipe Flow Travel Time Pipe Flow Travel Time
Flow Distance m Flow Distance m
Fall of Channel m Fall of Channel m
Time mins Time mins
Kerb Flow Kerb Flow
Length m Length m
Slope % Slope %
Time 0.0 mins Time 0.0 mins
Channel Flow (Figure 4.8 QUDM, or Channel Flow (Figure 4.8 QUDM, or
Manning's Equation) Manning's Equation)
Flow Distance m Flow Distance m
Fall of Channel m Fall of Channel m
Time mins Time mins
Adopted Time of Adopted Time of
Concentration
5 mins Concentration
5 mins
Pre-Development Peak Discharges Post-Development Peak Discharges
Design Storm Frequency
Area (ha) Cy Iy (mm/h) Qy (m3/s) (AEP) Factor (Fy)
Area (ha) Cy Iy (mm/h) Qy (m3/s)
0.0647 0.56 125 0.013 63.20% 0.80 0.0647 0.68 125 0.015
0.0647 0.595 157 0.017 39.35% 0.85 0.0647 0.7225 157 0.02
0.0647 0.665 196 0.023 18.14% 0.95 0.0647 0.8075 196 0.028
0.0647 0.7 226 0.028 10% 1.00 0.0647 0.85 226 0.034
0.0647 0.735 258 0.034 5% 1.05 0.0647 0.8925 258 0.041
0.0647 0.805 300 0.043 2% 1.15 0.0647 0.9775 300 0.053
0.0647 0.84 331 0.05 1% 1.20 0.0647 1 331 0.06
Discharge Comparison
AEP 63.20% 39.35% 18.14% 10% 5% 2% 1%
Difference 0.002 0.003 0.005 0.006 0.007 0.01 0.01
Percentage 15.4% 17.6% 21.7% 21.4% 20.6% 23.3% 20.0%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original