MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 104, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Construction Environmental Management Plan



Tasks                                  Actions / Monitoring                                                                         Timing    Responsibility
Ensure any findings of human           If any human bones are found, notify the Queensland Police and the Cultural Heritage         Ongoing   Contractor
bones are dealt with appropriately     Coordination Unit of DEHP as well as the Superintendent and the Principal.
in accordance with the guidelines      Ensure all bones remain in situ until identified. Do not recommence works until
for the appropriate handling of        notification has been given by the Police or DEHP that suitable arrangements have
Aboriginal and     Torres Strait       been made for removal.
Islander human remains.
Record keeping.                        Ensure all records and reports are made available to relevant administering authorities      Ongoing   Contractor
                                       upon request.
Corrective actions.                    Should there be non-compliance with the stated performance indicators the following          Ongoing   Contractor
                                       corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;

                                            implementation of appropriate mitigation measures as determined by the Principal
                                             in consultation with the Contractor and relevant experts (where required); and

                                            relevant validation monitoring to confirm that the nominated corrective actions have
                                             been effective.
                                       The Contractor shall implement the corrective action(s) as required within the agreed
                                       timeframe noted on the CAR.




Noosa Civic                                                                     Version 1                                                      November 2014
Appendix B - Construction EMP.docx                                                                                                                  Page 11
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.