MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 113, section 1. The text section number identifies this passage in the reader.
Noosa Civic
Construction Environmental Management Plan
4.5 Element 5: Storage and Handling of Hazardous Materials
Rationale
Works may require the use or handling of dangerous or hazardous materials such as fuels, oils and hydraulic fluids (e.g. during on-site refuelling
of machinery). While these are not expected to be stored on-site in large quantities, management of the site is required in order to avoid potential
adverse impacts to human health and the receiving environment as a result of inappropriate storage and handling of hazardous materials.
The spill response procedure to be followed for the project is described in Section 3.5.3 above.
Objective/Target
Compliance with the EP Act and AS1940-2004: The storage and handling of flammable and combustible liquids.
To effectively manage the safe storage and handling of hazardous materials within the construction site.
Performance Indicators
No adverse impacts to human health or the receiving environment associated with the storage or handling of hazardous materials on site.
Management Measures
Tasks Actions / Monitoring Timing Responsibility
Maintain a register of all Display an appropriate MSDS with each dangerous/hazardous substance stored on- Prior to and Contractor
dangerous or hazardous site, and as part of the register. during
substances stored within the site construction
and all associated Material Safety
Data Sheets (MSDS).
Hazardous materials shall be Store hazardous materials in an adequately controlled containment area, with Prior to Contractor
appropriately stored. incompatible substances stored separately. Design containment areas to ensure: commencement
of construction.
entry of stormwater is prevented;
the containment of spillages is achieved in accordance with the nature of
stored materials, the MSDS, and manufacturers’ instructions; and
provision is made for disposal of any captured liquid in accordance with
the MSDS and manufacturers’ instructions.
Include inspection of storage areas in daily site monitoring/checklists to ensure that
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.