Noosa Civic
Construction Environmental Management Plan
Tasks Actions / Monitoring Timing Responsibility
spillage or seepage has not occurred and that the integrity of the containment area is
not compromised.
Formally audit storage area of dangerous/hazardous substances weekly and record
appropriately.
Ensure storage and handling of Ensure site induction training includes appropriate information regarding the storage During site Contractor
dangerous or hazardous and handling of hazardous substances, including instructions on emergency spill inductions
materials (e.g. refuelling) occurs response procedures and the location of spill response kits.
at the site camp or as far as
practicable away from any woody Storage of hazardous materials shall occur as far as practicable from local creeks and Ongoing
vegetation or waters to protect other waters (including stormwater drains).
the receiving environment in the Refuelling shall only occur in pre-existing designated refuelling areas, located at least
event of a spill. 50m away from local creeks or drains, and preferably offsite.
Ensure appropriate and sufficient spill cleanup materials are available at all times.
Maintain a record of any accidental release or spillage of hazardous materials
including details or corrective actions undertaken. Immediately report any such
incident to the Principal.
Notify the Principal and relevant administering authority in the event of an accidental
release of hazardous materials from the site with the potential to cause environmental
harm.
Record keeping. Ensure all records and reports are made available to relevant administering authorities Ongoing Contractor
upon request.
Corrective actions. Should there be non-compliance with the stated performance indicators the following Ongoing Contractor
corrective actions are to be implemented:
identification of the cause of the non-compliance;
implementation of appropriate mitigation measures as determined by the
Principal in consultation with the Contractor and relevant experts (where
required); and
relevant validation monitoring to confirm that the nominated corrective
actions have been effective.
The Contractor shall implement the corrective action(s) as required within the agreed
timeframe noted on the CAR.
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.