Noosa Civic
Construction Environmental Management Plan
4.7 Element 7: Waste Management
Rationale
Waste management at the site is required to determine appropriate methods to avoid, reuse, recycle and dispose of construction-related waste,
in order to minimise the unnecessary depletion of natural resources and creation of waste requiring disposal.
Objective/Target
To ensure all waste material associated with the works is appropriately managed.
Performance Indicators
No waste of any type is inappropriately disposed of onsite.
Management Measures
Tasks Actions / Monitoring Timing Responsibility
Ensure all construction and Audit the site for inappropriate disposal of domestic waste. Daily Environmental
domestic waste (paper, plastic, Management
etc) is removed and appropriately Officer
disposed of offsite.
Re-use excavated materials for Audit the waste schedule, disposal records and storage areas for excavated materials. Weekly Environmental
onsite filling where appropriate. Management
Officer
Appropriately manage, handle, Any handling or potential disturbance to asbestos products must only be conducted by
remove and dispose of asbestos an appropriately licensed asbestos removal contractor. All asbestos waste must be
containing products. appropriately removed, sealed and transported offsite in accordance with relevant
guidelines and codes of practice.
Record keeping. Ensure all records and reports are made available to relevant administering authorities Ongoing Contractor
upon request.
Corrective actions. Should there be non-compliance with the stated performance indicators the following Ongoing Contractor
corrective actions are to be implemented:
identification of the cause of the non-compliance;
implementation of appropriate mitigation measures as determined by the
Noosa Civic Version 1 November 2014
Appendix B - Construction EMP.docx Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.