MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 118, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Construction Environmental Management Plan



 Tasks                                  Actions / Monitoring                                                                      Timing          Responsibility
 arrangements.
 Maintain construction site in an       Manage construction activities and materials to ensure the site is maintained in a neat   Ongoing         Contractor
 orderly and neat fashion.              and tidy manner.
                                        Store and respread topsoil as soon as practicable to minimise visual disturbance
                                        associated with excavation activities.
 Minimise visual impact of site         Ensure stockpiles, storage areas and site parking are restricted to designated areas      Ongoing         Contractor
 compounds.                             only.
 Clean-up site as soon as               Remove all vehicles, construction equipment, materials and refuse from the site as soon   On              Contractor
 practicable following completion       as practicable on completion of works.                                                    completion of
 of works.                                                                                                                        works
 Provide    appropriate     fencing,    The construction worksite at each construction stage shall be securely fenced off with    Ongoing as      Contractor
 signage    and      other    control   appropriate signage to prevent unauthorised entry to worksite.                            necessary
 measures          to        prevent
 unauthorised     entry    to    the
 construction sites.
 Record keeping.                        Maintain records of any monitoring results including details of corrective actions and    Ongoing         Contractor
                                        repairs/maintenance undertaken.
                                        Maintain records of any enquiries/complaints received in relation to construction works
                                        including complainant details, nature of complaint and corrective actions undertaken.
                                        Ensure all records and reports are made available to relevant administering authorities
                                        upon request.
 Corrective actions                     Should there be non-compliance with the stated performance indicators the following       Ongoing         Contractor
                                        corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                        The Contractor shall implement the corrective action(s) as required within the agreed
                                        timeframe noted on the CAR.



Noosa Civic                                                                   Version 1                                                            November 2014
Appendix B - Construction EMP.docx                                                                                                                      Page 25
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.