MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 127, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Erosion Sediment Control Plan




1                 Concept Earthworks
1.1               Site Earthworks
With the proposed expansion of the Noosa Civic centre it is necessary to re-profile the expansion area into
the desired shape for the construction of the required carpark and building platforms. The intent is to work
with the existing land form as much as is possible. It is necessary to excavate the area for the carpark under
the proposed new buildings and to shape the balance of the site to suit the needs of the carpark and access
connections.

1.2               External Catchment
A minor external catchment enters the proposed construction site from the east and runs overland across the
site to the existing natural gully on the immediate western boundary of the proposed site. It is proposed to
form an open channel during the initial earthworks phase to convey this external catchment around the
construction, to the north and south. As the final stormwater drainage solution is realised and becomes
operational this will ultimately convey the clean water from the external catchment and the open drainage
channel will be removed.

1.3               Site Physical Characteristics Constraints and Opportunities
The site constraints lay primarily with the proximity to the existing commercial development to the north-west
and the covenant area immediately adjacent the site on the west. Sufficient erosion and sediment controls,
along with appropriate drainage management, will mitigate any potential impact as far as practicable.
Communication with the neighbouring community will be undertaken and contact information provided in the
event of issues arising from the works.




QIC Noosa Civic Pty Ltd                            Version 1                                     November 2014
Appendix C - ESCP.docx                                                                                 Page 1
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.