Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 128, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Erosion Sediment Control Plan




2                 Erosion and Sediment Control
2.1               Erosion Hazard Assessment
The following hazard factors have been considered in preparing the Soil Erosion and Sediment Control
Plans. Whilst it is considered a very low risk, from an erosion hazard perspective, the location and the area
of disturbed ground are significant enough to warrant appropriate drainage, erosion and sediment controls to
mitigate the potential impact that the earthworks on the site may cause.
An analysis of the potential soil loss from the development site is contained within the Sediment Basin Sizing
calculations; refer below, along with a preliminary sizing of a sediment basin to cater for the entire
construction site.

                 Site area                       Sub-catchments                       Remarks
                                          S1
 Total catchment area (ha)               7.749
 Disturbed catchment area (ha)           7.749


 Soil analysis (enter sediment type if known, or laboratory particle size data)
 Sediment Type (C, F or D) if known:      D


 % sand (fraction 0.02 to 2.00 mm)
 % silt (fraction 0.002 to 0.02 mm)
 % clay (fraction finer than 0.002 mm)
 Dispersion percentage
 % of whole soil dispersible
 Soil Texture Group                       D


 Rainfall data
 Design rainfall depth (days)              5
 Design rainfall depth (percentile)       80
 x-day, y-percentile rainfall event      46.3
 Rainfall R-factor (if known)
 IFD: 2-year, 6-hour storm (if known)    15.8


 RUSLE Factors
 Rainfall erosivity (R-factor)           5660
 Soil erodibility (K-factor)             0.05
 Slope length (m)                         80
 Slope gradient (%)                        2
 Length/gradient (LS-factor)             0.41
 Erosion control practice (P-factor)      1.3
 Ground cover (C-factor)                   1




QIC Noosa Civic Pty Ltd                              Version 1                                   November 2014
Appendix C - ESCP.docx                                                                                 Page 2
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.