MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 132, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Erosion Sediment Control Plan



During Earthworks operations

 Item                                                         Removed
 Install cut off drains and diversion banks for dirty water   Upon site establishment completion, cover 80%
 collection
 Clear staged works area
 Strip topsoil to stockpile and provide flow controls and
 downstream filter fence
 Carry out earthworks, profile and topsoil
 Mulch / seed / turf completed staged earthworks
 embankment areas immediately upon completion
 Stabilise allotments / earthworks area with appropriate
 measures
  Install silt fences / contour banks to manage sheet flow    Upon site establishment completion, cover 80%
 lengths



3.4               Site Monitoring
All water quality data, including dates of rainfall, dates of testing, testing results and dates of water release,
must be kept in an on-site register. The register is to be maintained up to date for the duration of the
approved works and be available on-site for inspection by request.
All environmentally relevant incidents must be recorded in a field log that must remain accessible to all
relevant regulatory authorities.

3.5               Water Quality Criteria
Water quality criteria for discharge from the site are detailed within the relevant Environmental Management
Plan.
Table 3-1         Site Discharge Water Quality Criteria

                                TSS                  NTU                     pH
 Requirement                <50mg/L               < 100NTU                6.5 to 8.5




QIC Noosa Civic Pty Ltd                                 Version 1                                       November 2014
Appendix C - ESCP.docx                                                                                        Page 6
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗