Skip to the record
Accept no substitutions.

Original source · versioned page text

MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 39, section 1. The text section number identifies this passage in the reader.

August 2004 -8- 04682104(AB)

 

6.1.4 Pond Construction

It is understood that stormwater ponds / basins will be constructed in the vicinity of the existing
drainage lines. Should bund walls be proposed, the walls should include a clay ‘core’,
preferably medium to high plasticity silty clay, compacted at moisture contents within the range
of -1% to +3% of optimum moisture content for Standard Compaction to achieve a dry density
ratio of at least 98% of the Maximum Standard Dry Density. In order to prevent shrinkage
cracking and leakage through the clay core, it is recommended that the core should be overlain
by a 600 mm to 800 mm cover of low plasticity material, including a ‘topsoil’ surface which
should be grassed. Areas likely to be subject to erosion may require additional protection using
appropriate ‘rock armour’ materials.

Where sand or low plasticity clay material is encountered in the walls or floor of pond
excavations, such material should be over-excavated and replaced with a low permeability clay
liner (preferably medium to high plasticity silty clay). The liner should be placed as a 300 mm
thickness loose layer and compacted in accordance with the specifications for pond clay core
construction, as described above. The use of a low plasticity cover. to prevent shrinkage
cracking should also be considered within, and above, the water level fluctuation zone around
the pond walls.

6.1.5 Batter Slopes

For short-term construction periods, excavated unsurcharged faces could be battered at 1V:2H
in the sand and 1V:1H in the clay. Flatter batters may be required if significant ground water
seepage is encountered. Permanent batters in the sand and natural clay / compacted clay fill
should not be steeper than 1V:3H and 1V:2H respectively, or supported by an engineer designed
retained structure (ref. Section 6.2) where steeper slopes are required.

6.2. Retaining Structure Design

Retaining structure design should be carried out using a triangular pressure distribution applicable
to the wall type (ie. active pressures for a cantilever wall or at rest pressures for a
propped/anchored wall) and based on the parameters in Table 1. The values in Table 1 assume
that the walls are fully drained and no allowance is included for construction loading, up-slope
foundation loadings, the effect of sloping ground, or backfill compaction stresses.

Golder Associates
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.