Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

2

oN

August 2004 -9- 04682104(AB)

 

Table 1 — Retaining Structure Design Parameters

 

 

 

 

 

Retained Material Unit Friction Lateral Earth Pressure Coefficient

 

 

 

 

 

 

Weight Angle
(tim) | (Degrees)

 

 

 

 

 

 

K, Ky K,
Medium Dene Sand L7 34 0.3 0.5 3.5
Stiff a Stffer) Clay 18 27 0.4 0.6 2.6
: ee i : : * * * * *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

*: Variable dependent upon the type of material used and the degree of compaction achieved.

Positive permanent drainage must be. installed behind retaining walls unless they are designed
for development of full hydrostatic pressures.

6.3 Preliminary Footing Design

The investigation results indicate that the soils in the proposed excavation area should mostly
comprise low to medium plasticity sandy clay and, therefore, the resultant site classification
across the cut areas should typically be ‘M’ in accordance with AS2870-1996. An ‘M’
classification should also be achievable across the fill areas subject to the placement of any high
plasticity soils at least 1 m below the finished fill surface level.

High plasticity clays may be exposed at the cut subgrade level in the eastern part of the site and
partly across the ridge, these areas being primarily where pavements are proposed.

Building loads were not available at the time of reporting, however we are advised that the
proposed development will comprise low-rise commercial structures. The advice given below
is based upon the anticipated order of building loads together with site conditions following
proposed bulk earthworks.

Following earthworks to form the proposed site profile, the exposed building subgrade should
comprise mostly very stiff (or stronger) natural sandy clay or compacted fill. Conventional high
level strip or pad footings founded at least 600 mm below the finished ground level in the very
stiff natural clay or compacted fill may be designed using a preliminary allowable bearing
pressure of 150 kPa, for resultant total settlements of less than 25 mm.

Golder Associates
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.