MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

August 2004 -10- 04682104(AB)

 

o™.

Based upon the laboratory test results, footings for one or two storey residential style buildings
(eg. for offices) may be designed using a preliminary site classification of ‘M’ in accordance
with Australian Standard AS2870-1996 “Residential Slabs and Footings”.

Heavy column loads from buildings or wind-loaded pylons (eg. for signage) may require
support by piled foundations. Our investigation results indicate that the most suitable piling
option is likely to comprise bored piles which socket into very stiff to hard clay or weathered
sandstone.

The founding depth for such piles will be dependent upon building loads and the variability in
stratigraphy over the piling depth. For preliminary design purposes, bored piles founded in very
stiff natural clay may be proportioned in accordance with an allowable end bearing pressure of
400 kPa and allowable side adhesion of 30 kPa. These values assume that the pile bases are
cleaned of any loose or water-softened material and that there is intimate contact between the
pile shaft and foundation. Side adhesion should be neglected for the upper 1.5 m length of
socket (below ground level).

At the completion of bulk earthworks, it is recommended that Golder Associates should carry
out further investigation of the proposed building areas in order to confirm the advice given
above for conventional (ie. high level) footings. This would comprise inspection by an
experienced Geotechnical Engineer together. with borehole probing (4WD auger rig), DCP
testing and laboratory Shrink-Swell testing.

6.4 Preliminary Pavement Design

Design parameters for pavements will be dependent upon the ‘subgrade materials present after
earthworks and the type, depth and quality of new fill used to bring the site to design levels.
The test pit / borehole and laboratory test results from this site indicate that the subgrade
materials exposed/formed following earthworks may vary dependent upon the location. CBR -
values assessed from the results of this investigation, and from previous experience, are
provided in Table 2. It should be noted that these values assume that the subgrade is well
drained during construction and operation.

Golder Associates
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.