August 2004 -10- 04682104(AB) o™. Based upon the laboratory test results, footings for one or two storey residential style buildings (eg. for offices) may be designed using a preliminary site classification of ‘M’ in accordance with Australian Standard AS2870-1996 “Residential Slabs and Footings”. Heavy column loads from buildings or wind-loaded pylons (eg. for signage) may require support by piled foundations. Our investigation results indicate that the most suitable piling option is likely to comprise bored piles which socket into very stiff to hard clay or weathered sandstone. The founding depth for such piles will be dependent upon building loads and the variability in stratigraphy over the piling depth. For preliminary design purposes, bored piles founded in very stiff natural clay may be proportioned in accordance with an allowable end bearing pressure of 400 kPa and allowable side adhesion of 30 kPa. These values assume that the pile bases are cleaned of any loose or water-softened material and that there is intimate contact between the pile shaft and foundation. Side adhesion should be neglected for the upper 1.5 m length of socket (below ground level). At the completion of bulk earthworks, it is recommended that Golder Associates should carry out further investigation of the proposed building areas in order to confirm the advice given above for conventional (ie. high level) footings. This would comprise inspection by an experienced Geotechnical Engineer together. with borehole probing (4WD auger rig), DCP testing and laboratory Shrink-Swell testing. 6.4 Preliminary Pavement Design Design parameters for pavements will be dependent upon the ‘subgrade materials present after earthworks and the type, depth and quality of new fill used to bring the site to design levels. The test pit / borehole and laboratory test results from this site indicate that the subgrade materials exposed/formed following earthworks may vary dependent upon the location. CBR - values assessed from the results of this investigation, and from previous experience, are provided in Table 2. It should be noted that these values assume that the subgrade is well drained during construction and operation. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.