MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 93, section 1. The text section number identifies this passage in the reader.
Noosa Civic
Construction Environmental Management Plan
Table of Contents
1 Introduction 1
2 Objectives 2
3 Environmental Management Plan Preamble 3
3.1 Legislative Framework 3
3.2 Terminology 3
3.3 Program and Contractual Obligations 4
3.4 Non-compliance with the CEMP and Corrective Action Requirements 4
3.5 Emergency and Contingency Plans 4
3.5.1 Heavy or Prolonged Rainfall 5
3.5.2 Halt in Construction Works due to Unforeseen Circumstances 5
3.5.3 Spill Response Measures 5
3.5.4 Environmental Incidents and Emergencies 6
3.6 Competence, Training and Awareness 6
4 Environmental Management Measures 7
4.1 Element 1: Acid Sulfate Soils 7
4.2 Element 2: Cultural Heritage 10
4.3 Element 3: Soil Erosion & Sediment Loss 12
4.4 Element 4: Fauna and Flora, Weeds and Pests. 16
4.5 Element 5: Storage and Handling of Hazardous Materials 20
4.6 Element 6: Public Amenity and Community 22
4.7 Element 7: Waste Management 26
4.8 Element 8: Traffic Control Management 28
Tables
Table 4-1 Construction Stormwater Quality Objectives 13
Table 4-2 General nuisance noise level limits 23
QIC Noosa Civic Pty Ltd Version 1 November 2014
Appendix B - Construction EMP.docx Page iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.