Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 94, section 1. The text section number identifies this passage in the reader.
Noosa Civic Construction Environmental Management Plan 1 Introduction QIC Noosa Civic Pty Ltd (QIC) is proposing to expand Noosa Civic located at 28 Eenie Creek Road, Noosaville, within Noosa Shire. The site of the proposed expansion is currently in an undeveloped natural state. Cardno (Qld) Pty Ltd (Cardno) was commissioned to provide environmental management planning services to the applicant in relation to the design and environmental management of the construction works. This Construction Environmental Management Plan (CEMP) has been prepared by Cardno to provide details of the environmental management requirements for construction of the project, as well as certain operational aspects. This CEMP provides overarching performance criteria that are to be met in order to minimise impacts of the works on the surrounding physical and social environment. In particular, the aims of this CEMP are to ensure that: commitments and recommendations made by this CEMP and relevant technical reports for the purpose of protecting environmental values are implemented during the operational works; a high level of environmental care and responsibility is demonstrated and best practice environmental management is achieved during the construction phase of the project; compliance with relevant legislation and permit conditions are demonstrated and satisfied; and environmental responsibilities, monitoring, reporting and auditing procedures are established to demonstrate due diligence. While this CEMP will form the basis of the contractor’s corresponding Plan, it is not intended as a replacement for due consideration of the management of issues and impacts by the contractor. Noosa Civic Version 1 November 2014 Appendix B - Construction EMP.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.