Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 98, section 1. The text section number identifies this passage in the reader.

Noosa Civic
Construction Environmental Management Plan



3.5.1              Heavy or Prolonged Rainfall
Stormwater treatment and conveyance measures shall be employed at the site during the construction phase
to adequately manage stormwater flows. During periods of heavy or prolonged rainfall, the following
precautionary measures shall be implemented:
     the Contractor shall cease construction activities until the site has been adequately drained;
     the Contractor shall inspect erosion and sediment control measures to ensure optimal performance is
      being achieved;
     the Contractor shall recommence construction works only after the site has been assessed and it has
      been determined that the risk of erosion and sedimentation has returned to pre-rainfall conditions; and
     the Contractor shall recommence construction works only after all erosion and sediment control
      measures have been assessed and it is confirmed that all structures are operating at optimal
      performance. Should failures occur, repairs and/or replacements shall be implemented prior to the re-
      commencement of construction works.

3.5.2              Halt in Construction Works due to Unforeseen Circumstances
In the event that construction works are halted due to unforeseen circumstances, the Contractor shall ensure
that all erosion and sediment control measures are intact and operational, and ensure that environmental
deterioration does not occur over the ‘stop works’ period.
Prior to vacating the site, the Contractor shall ensure that any stockpiles are adequately stabilised and the
total disturbed area is minimised to the greatest extent practicable. In addition, any site conditions that could
conceivably degrade over time and result in environmental harm shall be rectified.
The Contractor shall monitor and maintain site erosion and sediment control devices on a continual basis
until work re-commences at the site.

3.5.3              Spill Response Measures
In the event that accidental release of material occurs at the site, the following actions shall be implemented.
     Appropriately trained staff shall take steps to contain the released material, if possible, until remedial
      measures are fully implemented.
     The Contractor shall be notified to make an initial assessment of the severity of the accidental release
      and the nature of the material.
     The Contractor shall notify the Principal and any administering authorities as required by law.
     The Contractor shall take steps in consultation with the relevant administering authorities (if notified) to
      treat, remove or otherwise manage the released material.
     Appropriately qualified personnel shall make an assessment of the area to confirm the success of the
      remediation works and whether additional works are required.
     Appropriately qualified personnel shall assess the work procedures or cause of the failure and implement
      any changes required to prevent reoccurrence of a similar incident in the future.
     Following completion of remedial actions the Contractor shall provide an incident report or CAR to the
      Principal detailing the nature of the incident and the corrective actions implemented.




Noosa Civic                                          Version 1                                         November 2014
Appendix B - Construction EMP.docx                                                                           Page 5
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.