INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continuea)

 

    

      

     

 

      
   

 

 

 

DEINo - Goto. 04.9 (1 Yes - Answer both (a) and (b) below

 

4.6 {Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
BAINo-Got0as7 [Yes - Answer (a) and (b} below
(a) Are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 LINo O Yes
(ii) A regulation under the IPA or the Water Act 2000 CINo (Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ke). This appkcation requires assessment by the Department of Natural
Resources and Water (NRW). if NAW is not the Assessment Manager for the application. the agency has jurisdiction as
Concurrence Agency.
{b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?

[] No (Yes - i any part of the proposal relates to operational work in a high preservation area other than works stated in a wild river
declaration for ihe area to be assessable development for which a development application may be made. the application wilt
be taken to be not properly made and the Assessment Manager must refuse to receive il. All other proposals are Subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of the Wild Rivers Act 2005.
(Compete Form 1. Part Kgif an appication is made.) @

rare Fle Beat eats s lgett hoe t ort . rt GA. yee Ae
dG ee 34 Oe,
4.7 _ |\s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No-Gotoass [Yes
If yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 LINo (Yes
(ii) A regulation under the IPA or the Water Act 2000 CI No 0 Yes
If yes to either or both of {i) or (ii) above - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural
Resources and Water (NRW). if NAW is not the Assessmen! Manager for the application, the agency has jurisdiction as
Concurrence Agency.
1A ys Dviae a 4 ‘
act Be ay He os ov MOS “ . a
4.8 | Does any of the proposed operational work for any thing constructed or installed that allows, under the

Water Act 2000, for interfering
with overland flow water (other than using a water truck to pump water)?

(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?

0 Yes
If yes, indicate what the proposed operational work relates to @
{i} Specified works for the area (No CJ Yes
(ii) Work state in the relevant wild river deciaration to be (No Yes
assessable development for which an application may
be lodged
If yes to either or both of (i) or (ii) above - (Complete Form 1. Part Kio Subject to the declaration for the relevant wild river area, assessment

may be required for the purposes of the Wild Rivers Act 2005)
If no to both (i) and (ii) above - the application will be taken to be not properly made and the Assessment Manager must refuse to receive it.

C1 No

ino, are the operations mentioned as assessable development in the following?
(iii) A water resource plan under the Water Act 2000 [No 1) Yes
(iv) A regulation under the IPA or the Water Act 2000 LJ No OU Yes

If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ko) This application requires assessment by the Department of Natural
Resources and Water (NRW). It NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
D No Oo Yes - (Complete Form 1, Part Kic) This application requires assessment by the Department of Natural Resources and Water

(NRW). If NRW is not the Assessment Manager for the application. the agency has jurisdiction ag Concurrence Agency.

PRA OND ote 2 oe FOR Re ewe oR

  

 

 

 

Page 32

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.