INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklis!, Version 21.3, 9 May 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

49 |\s the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Act 2000 DENo (1 Yes
ii) To increase the storage capacity of a referable dam by more than 10% BANo (] Yes

 

If yes to either or both of (i} or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Depariment of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency,

sae 2A

ang pee

TIDAL WORK; WILD RIVER AREA

4.10 | Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(INo-Getoas11 J Yes - Answer (a) and (b) below

 

 

{a) 4s any of the proposed tidal work prescribed tidal work?

Bd Yes

tf yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?

BLNo

If no, is the work proposed in a canal?

{No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

(J No - (Complete Form 1, Part P). it the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport {Maritime Safety Qid) as Concurrence Agency.

CI Yes - (Complete Form 1. Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Safely Old) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.

Byes

it yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

& No - (Complete Form 1. Part P). This application must be referred to Queensland Transport (Maritime Safety Old) as.
Concurrence Agency.

f] Yes - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as
Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.

[7] Yes

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?

(_J No - An application for the operational work wil! be taken to be not properly made and the Assessment Manager must
refuse to receive it.

_ Des

If yes, is the work proposed in a canal?

LINo

If no. is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - Unless the application is consistent with any property development plan applying to the land, ihe Assessment
Manager must reluse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensiand Transport (Maritime Safety Qid} as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.

oO Yes ~ Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it, (Complete Form 1, Part P} if the Environmental Protection Agency {EPA} is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qld Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the
application also requires assessment for the purposes of the Wild Rivers Act 2005.

 

0 Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - Unless the appfication is consistent with any property development plan applying to the land. the Assessment
Manager musi retuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Mantime Satety Qld) as Concurrence Agency. Subject to the declaration for the relevant wild river
area, the application also requires assessment tor the purposes of the Wild Rivers Act 2005.

oO Y@S - Uniess the application is consistent with any property development plan apolving fo the land. the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qld) as Concurrence Agency and Old Fire and Rescue Service as Advice Agency.
The application also requires assessment for the purposes of the Wild Rivers Act 2005.

 

 

I No - Go to the first question on the next page of this Checklist

 

 

Page 33

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.