Form 1 Development Application
Part P
Prescribed tidal work
Nature of the prescribed tidal work
1. Whatis the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable boxes)
(vi) Revetment, sea wall or retaining wall
Nature of the prescribed tidal works Nature of use Estimated value of Type of approval sought
(Tick applicable box/es) | _ completed works ($}
i) Jetty, pier or wharf LD Private use
Cy) Jetty 8 C1 _Non-private use
ii} Boat ramp or spillwa 1 Private use
Oy Por Splway L_Non-private use
iii) Mooring pile [1] Private use
Ca oP (11 Non-private use
iv) Deck or boardwalk 1 Private use
Ohm [1 Non-private use
Bd Private use
[1 |) Pontoon ( Non-private use [Development Permit
Prelimi Ay i
o CO Private use C] Preliminary Approval
Oo
Non-private use
(vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, groyne, pipeline or other
underground service etc.) — Provide delails below
Private use
Non-private use
|
OO
2. _ Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to
the work and neighbouring lots are not at right angles to the waterway?
{1 No al Yes —Submit, with the application, photos of ary constructed neighbouring structures, or information about approved but
unconstructed neighbouring structures.
Adjoining property access and evidence of support
3. _ Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
LJ No KK], Yes - Complete 03(a)
3(a} What is the nature of the evidence?
(2) Letters of support from adjoining property owner - Submit, with the application, the letters of support.
D4 Plans illustrating a water allocation area — Submit, with the application, the plans illustrating the water allocation area,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.