09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published] · 142009.134
INTEGRATED PLANNING ACT 1997
Certification
Part P, Version 2.1, 3 March 2008
4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivalent certified that the works comply with the
design and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and
Management Regulation 2003?
J No Eq Yes — Provide details below
Name of RPEQ or equivalent
DAVID LESMES
RPEQ No. or equivalent | a g
Contact mailing address
P.O.Box 1322 SUNSHINE PLAZA [4558
Contact telephone number
KC7) S40 8010S
Contact facsimile number
OnNS45(\823
Reference number of all plans to which this certification relates
4A77?-CO\-03)
Mandatory information
5. Confirm the following mandatory information accompanies this application.
Plans and written documentation Confirmation of Method of lodgement
lodgement
(i) The location and dimensions of the proposed tidal work in relation to the los abutting the |B Confirmed | Heched
Proposed work and the tidal {and on which the work is proposed to be located drawithkas.
(ii) All other structures on the waterfront and within 20 metres of the proposed works Bf . Confirmed i. v
(ii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide BX Confirmed a
(HAT) and Mean High Water Springs (MHWS)
(iv) The slope angles of the beds and banks of the tidal area K Confirmed u
(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work (I Confirmed
in the Coastal Protection and Management Regulation 2003, schedule 4A (e.g. physical a
appearance, lighting, signage, earthworks, public access, infrastructure, structural components,
engineering dasign standards)
(vi) The finished levels of the proposed works &1 Confirmed &
(vii) Details of the largest vessel, if any, to be moored at the structure 1 Confirmed
BY Not applicable
OFFICE USE ONLY .
[Date received l ] [Reference numbers | [EPA cost code 433061 | e}
Advice for completing Part P
General advice
* — Part A must also be completed for all IDAS development applications.
+ The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
another question.
« When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet
Electronically paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transfer (EFT) payment
notification to the application.
» For further information about completing this form go to:
IDAS Guide 24 (Prescribed tidal work
Ecoaccess website
EPA Guidelines and procedural quides
a A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not
authorise development to occur.
Q4 A Registered Professional Engineer of Queensland (RPEQ), or the interstate equivalent, may certify that the proposed work complies with
the design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003,
schedule 4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local government.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.