Appendix B - Bushfire Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn iv. On site and off site fire
hazard implications of the
development
v. Bushfire history
vi. Conservation values of the
site; and
vii. Ongoing maintenance.
8.8 (O12) Road network provides for safe The proposed driveway provides adequate access and egress
and effective evacuation of users of to the main road; and
premises and access by Emergency S12.2 Roads have a gradient below 12.5%.
services.
8.9 (O13) Lot design and building siting There is no available alternative location for the dwelling, and
minimises bushfire hazard to people and fire mitigation measures specified under this Plan serve to
property having regard to slope, aspect, reduce the risk of people and property to acceptable levels.
existing vegetation and adequate
separation from hazardous vegetation.
9.0 Assessment of proposal against State Planning Policy 2017
State Planning Policy – Natural hazards risk and resilience (SPP, December 2013, current version July 2017) replaces
State Planning Policy 1/03 Mitigating the Adverse Impacts of Flood, Bushfire and Landslide. The SPP Assessment
Benchmarks – Natural hazards risk and resilience provides a methodology for determining Bushfire Hazard based on
Potential Fireline Intensity. The methodology and hazard mapping has been included in Section 3.1 of this Plan in
establishing the adjacent area as potentially hazardous and as a bushfire prone area.
Part E of the SPP provides development assessment benchmarks to ensure that State interests are appropriately
considered in relation to natural hazards, including bushfire hazard areas. These provisions serve as general guidelines to
either avoid or otherwise adequately mitigate bushfire risk. Specific guidelines for bushfire hazard overlay codes are yet
to be provided, and this detail is addressed by this Plan in terms of meeting the current requirements of Local
Government in Section 9 below.
Interim Development Assessment Solutions Provided
Requirements – SPP Part E
(3) Development avoids natural hazard This Plan establishes the nature and potential severity of the
areas or where it is not possible to adjacent hazard and provides a combination of bushfire protection
avoid the natural hazard area, measures to mitigate risk including park management, building
construction, asset protection zones, access, water supplies and
development mitigates the risks to
utilities, and emergency management arrangements.
people and property to an acceptable
or tolerable level, and
(4) Development supports, and does not The combined effect of the bushfire protection measures specified
unduly burden, disaster management by this Plan serves to reduce risk to a low level and ensure resilience
response or recovery capacity and and preparedness for unplanned fire so that the response or
recovery capacity and capability of emergency services is not unduly
capabilities, and
burdened or impeded. This Plan serves to protect life and property
from bushfire without depending on emergency services for
protection.
Report compiled by Bushfire Risk Reducers for The Planning Place, July 2021 Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.