Log in to see the plans as drawn (5) Development directly, indirectly and The development slightly reduces the nature of the existing hazard,
cumulatively avoids an increase in the and site layout and landscaping on the site is designed to moderate
severity of the natural hazard and the the exposure of buildings. The potential for damage to other
properties is not increased as a consequence of the proposed
potential for damage on the site or to
development.
other properties, and
(6) Risks to public safety and the Hazardous materials are not stored in quantities or locations on the
environment from the location of site which would pose a risk to the public or the environment.
hazardous materials and the release of
these materials is avoided, and
(7) The natural processes and the The development maintains the natural processes and protective
protective function of landforms and function of vegetation that previously existed for the site.
the vegetation that can mitigate risks
associated with the natural hazard are
maintained or enhanced.
10.0 Recommendations
1. The proposed dwelling shall be constructed to a minimum of BAL 29 (Sections 3 and 7) under AS3959-
2018.
Any other Class 10a structure built within 6m of the proposed residence shall also be constructed in
accordance with this Standard.
2. The minimum 13m setback agreed with Council and State shall be managed as APZ, as described in
Section 7.2.
3. Water supplies will be installed in accordance with Section 7.3 of this Plan.
4. Lot owners are aware of the existence of this assessment and their responsibilities outlined within it,
in particular construction, asset protection zone and emergency management.
11.0 Summary
The area of “hazard” faced by the proposed development is significant, and the likelihood of wildfire at some
time is regarded as likely. Risk mitigation measures should extend beyond construction as outlined by this
Plan.
Along with adequate water supply and emergency management arrangements, compliant construction under
AS3959-2018 and APZs to reduce the exposure of life and property to bushfire, these combined measures
assist prepare residents for the possibility of fire in the area.
Report compiled by Bushfire Risk Reducers for The Planning Place, July 2021 Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.