Original source · versioned page text
QC100259_Pomona Exchange_DD_Rev01-220630
Attached to the e-mail Operational Works Application OP"W22/0174 - DA Form 1 & 2 - Plans - 25 Railway Pde, Pomona.
1 2 3 4 5 6
DRAWING STATUS
REFERENCE ONLY
SHEET NO.
CONSTRUCTION
ISSUE NO.
PRELIMINARY
CANCELLED
AS BUILT
A DRAWING/DOCUMENT DRAWING ISSUE A
FOR
DESCRIPTION NUMBER DATE
SITE SPECIFIC NOTES - SHEET 1 OF 2 QC100259 S0 0.1 17/06/22 P
SITE SPECIFIC NOTES - SHEET 2 OF 2 QC100259 S0-1 0.1 17/06/22 P
SITE LAYOUT AND ACCESS
SITE LAYOUT
QC100259
QC100259
S1
S1-1 0.1
0.1 17/06/22
17/06/22
P
P
POMONA EXCHANGE
SITE SETOUT PLAN QC100259 S1-2 0.1 17/06/22 P Address ID QLD 183929 POMZ
B B
EAST ELEVATION QC100259 S3 0.1 17/06/22 P
ADDRESS: 25 RAILWAY PARADE
LOS PHOTOS QC100259 S7 0.1 17/06/22 P POMONA
QLD 4568
SITE EARTHING QC100259 G4 0.1 17/06/22 P
EARTHING SCENARIO QC100259 G4-1 0.1 17/06/22 P
SITE EARTHING SCHEMATIC QC100259 G4-2 0.1 17/06/22 P
BAR CONNECTIONS DIAGRAMS QC100259 G4-3 0.1 17/06/22 P
C
TRENCH DETAILS QC100259 G4-4 0.1 17/06/22 P C
AC POWER CONNECTION QC100259 E2 0.1 17/06/22 P
TE/RT CONSTRUCTION WORKS QC100259 E6 0.1 17/06/22 P
CONCRETE FOUNDATION DETAILS QC100259 T2 0.1 17/06/22 P
EQUIPMENT PLATFORM - H-FRAME DETAIL QC100259 T2-1 0.1 17/06/22 P
FOUNDATION DETAILS - CYCLONIC WIND ZONES QC100259 T2-2 0.1 17/06/22 P
D COMPOUND FENCE AND GATE DETAILS QC100259 T8 0.1 17/06/22 P D
DRAWING ENDORSEMENT BY CLIENT
E NAME DATE E
SIGNATURE STATUS
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
POMONA EXCHANGE
F DRAWING INDEX AND DOCUMENT CONTROL F
25 RAILWAY PARADE, POMONA, QLD 4568
DWG SHT DC
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg
SAN_CAD Template.DWG A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of pages 2 to 19 (of 20)
Page 2
1 2 3 4 5 6
SITE SPECIFIC NOTES SITE REFERENCE DETAILS
A OCCUPIER SITE NAME SITE CODE A
EQUIPMENT PLATFORM WORKPLACE HEALTH & SAFETY
TELSTRA POMONA EXCHANGE 183929
TYPE: PROPOSED STEEL 'MOON' PLATFORM. ASBESTOS CONTAINING MATERIALS WERE IDENTIFIED
SIZE (mm): APPROX. 915 x 1200mm. DURING INSPECTION & DESIGN STAGES, SUBSEQUENTLY
BASE TYPE: STEEL BASE PLATE CONFIRMED BY REVIEW OF THE TELSTRA REGISTER OF
ASBESTOS MATERIALS. ALL NECESSARY CONTROLS WILL SERVICES LEGEND
NEED TO BE IN PLACE DURING THE CONSTRUCTION PHASE
EARTHING TO CONTROL THIS IDENTIFIED HAZARD. OPTICAL FIBRE ABOVE GROUND
PROPOSED SAN EQUIPMENT AND COMPOUND SHALL BE OPTICAL FIBRE BELOW GROUND
EARTHED AS PER SAN AND TELSTRA REQUIREMENTS. GENERAL NOTES ABOVE GROUND ELECTRICAL SUPPLY
BELOW GROUND ELECTRICAL SUPPLY
B REFER TO SHEET G4 FOR SITE SPECIFIC EARTHING 1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS SPECIFIED
B
GAS SUPPLY BELOW GROUND
DETAILS. OTHERWISE. HIGH VOLTAGE ELECTRICAL SUPPLY
WATER SUPPLY ABOVE GROUND
2. ALL CABLES TO BE BIRD PROOFED AT TIME OF ACTIVE BUILD. BIRD PROOFING
ENVIRONMENTAL ISSUES SOLUTION TO BE PROVIDED BY VIASAT INCLUDING MATERIALS AS FREE ISSUE WATER SUPPLY BELOW GROUND
WITH ACTIVE KIT. SEWER LINE
REFER TO ENVIRONMENTAL RISK ASSESSMENT
CHECKLIST 018422f10 INCLUDE ANY ANIMALS: STORM WATER
3. SERVICES, WHERE SHOWN ARE INDICATIVELY ONLY. LOCATION OF ABOVE GROUND FEEDER CABLES
NESTING BIRDS: OSPREY ETC.
ALL RELEVANT EXISTING SERVICES SHALL BE IDENTIFIED AND
DANGEROUS SNAKES, WASPS & SPIDERS ETC. BELOW GROUND FEEDER CABLES
CONFIRMED PRIOR TO COMMENCING WORK. THE CONTRACTOR TO
MENACING CATTLE ETC. EARTH STRAP
LIAISE WITH RELEVANT AUTHORITIES FOR DIRECTIONS AND
PERMITS REQUIRED. ABOVE GROUND 16mm² EARTH
C C
POWER SUPPLY DIAL BEFORE YOU DIG 1100. BELOW GROUND 35mm² EARTH
BELOW GEOTEXTILE MAT,
32A/1P SUPPLY SHALL BE TAKEN FROM PROPOSED 4. CONSTRUCTORS ARE TO BE AWARE OF TELSTRA DOCUMENT 35mm² EARTH IN FLEX GREY CONDUIT
WALL MOUNTED EXTERNAL SAN DISTRIBUTION BOARD 007338-C8-11 AND IN PARTICULAR CLAUSE 7.3 & 10.3 WHICH
TO BE INSTALLED BY TELEPOWER. REFER TO SHEET DESCRIBES REQUIREMENTS PERSONNEL MUST UNDERTAKE IN
S1 AND S1-1 FOR PROPOSED LOCATION AND SHEET E2 RESPECT TO ASBESTOS MANAGEMENT AT TELSTRA FACILITIES.
1 EXISTING TELSTRA ANTENNA SECTOR
FOR AC POWER DETAILS.
5. PROPRIETARY PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH A1
DIAL 1100 BEFORE YOU DIG. MANUFACTURERS SPECIFICATIONS.
1 PROPOSED TELSTRA ANTENNA SECTOR
6. COMPOUND SHALL BE ORIENTATED TO SUIT SITE-SPECIFIC REQUIREMENTS &
PROPERTY SIGNAGE ANTENNA AZIMUTH. REFER TO SITE-SPECIFIC COMPOUND LAYOUT DRAWING.
A1
D D
SPECIFY PROPERTY SIGNAGE AS PER DOCUMENT 017866A12.
7. COMPOUND SHALL BE STRIPPED OF ALL VEGETATION & TOPSOIL. COMPOUND
SITE NAME: BRANDED SITE IDENTIFICATION REGULAR (BSr).
SHALL BE FINISHED WITH A LAYER OF GEOTEXTILE UNDERLYING MIN. 100mm
TELSTRA S/I NUMBER 187/00929.
LAYER OF SITE GRAVEL.
JABAC PART NUMBER TFMS929-M.
8. SITE GRAVEL:
SITE ACCESS VICTORIA: 100mm COMPACTED
THICKNESS SIZE 20 CLASS 3 FCR
VIA RAILWAY PARADE
REFER TO SHEET S1 QLD: 100mm COMPACTED THICKNESS
SITE S.A.C. TO ADVISE C.D.C. LOCATION DETAILS. TYPE 2.3 ROADBASE
E E
NSW/ACT: 100mm COMPACTED THICKNESS
SITE SIGNAGE DGS20 ROADBASE
ALL EME SIGNAGE IS REFERENCED ON DRAWINGS S1 & S3.
REFER TO DOCUMENT 005486 FOR DETAILS. CYCLONIC SITES
FOR CONSTRUCTION
TO BE READ IN CONJUNCTION WITH SHEETS S0-1, S1, S1-1 & S3.
REFER SHEET T2-2 FOR SPECIFIC REQUIREMENTS ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
FOR SITES IN NOMINATED CYCLONIC WIND ZONES. 183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F SITE SPECIFIC NOTES - SHEET 1 OF 2 F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT S0
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 3
1 2 3 4 5 6
SITE SIGNAGE ACCEPTANCE TESTING:
A A
1. PROVIDE PERSONNEL AND EQUIPMENT, MAKE REQUIRED
ONE OF EACH TO BE SUPPLIED PER SITE. TESTS, AND SUBMIT TEST REPORTS UPON COMPLETION
1
OF TESTS.
SITE SIGNAGE REQUIREMENTS 4
2. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO
SIGN TO BE YELLOW BACKGROUND 3
COMPLY WITH THE SPECIFIED REQUIREMENTS, THE
WITH BLACK LETTERING
NONCOMPLYING ITEMS SHALL BE REMOVED FROM THE 2
ALUMINIUM MATERIAL REQUIRED
JOBSITE AND REPLACED WITH ITEMS COMPLYING WITH THE
SPECIFIED REQUIREMENTS PROMPTLY AFTER RECEIPT OF
ATTACHED WITH GALVANIZED HOG TIES OR
NOTICE OF SUCH NON-COMPLIANCE.
STAINLESS HARDWARE
B A. TEST PROCEDURES: B
STICKER TO BE ATTACHED TO BACK OF 1. ALL FEEDERS SHALL HAVE THEIR INSULATION TESTED AFTER
DISH VISIBLE FROM GATE AT NO HIGHER INSTALLATION, BUT BEFORE CONNECTION TO DEVICES. THE
THAN EYE HEIGHT CONDUCTORS SHALL TEST FREE FROM SHORT CIRCUITS AND
GROUNDS. TESTING SHALL BE FOR ONE MINUTE USING 1000V
DC. INVESTIGATE ANY VALUES LESS THAN 50 MEGOHMS.
2. PRIOR TO ENERGIZING CIRCUITRY, TEST WIRING DEVICES FOR
SITE ID: ___________ ELECTRICAL CONTINUITY AND PROPER POLARITY
CONNECTIONS. 5
SITE SIGNAGE REQUIREMENTS
1
FOR ACCESS OR EMERGENCIES 2 ENGRAVED SIGNS
C ADHESIVE BACKED 3. MEASURE AND RECORD VOLTAGES BETWEEN PHASES AND C
CONTACT: 75mm x 150mm BETWEEN PHASE WIRES AND NEUTRALS. SUBMIT A REPORT
SERVICE ASSURANCE CENTER OF MAXIMUM AND MINIMUM VOLTAGES.
1800 842 728 END OF SECTION
SITE ID: ___________
END OF SPECIFICATION ADDRESS:_____________
________________________
FOR ACCESS OR EMERGENCIES
CONTACT:
SERVICE ASSURANCE CENTER
1800 842 728
FIP01 SITE SIGNAGE REQUIREMENTS
ENGRAVED SIGNS
3 ADHESIVE BACKED
D FIBER INTERFACE PANEL 75mm x 150mm
D
SERVICE FROM FIBER DEMARC SITE ID: ___________ 5
SERVICE TO EQUIPMENT CABINET ADDRESS:_____________
________________________ SITE SIGNAGE REQUIREMENTS
ALUMINIUM MATERIAL REQUIRED
200mm x 250mm
FOR ACCESS OR EMERGENCIES
CONTACT:
ATTACHED WITH GALVANIZED
MDP01 SERVICE ASSURANCE CENTER HOG TIES OR STAINLESS
SITE SIGNAGE REQUIREMENTS
1800 842 728 HARDWARE
ENGRAVED SIGNS
E MAIN DISTRIBUTION PANEL 4 ADHESIVE BACKED E
240v, 1 PH 75mm x 150mm
FED FROM TELCO SUPPLY
FEEDING EQUIPMENT CABINET
TO BE READ IN CONJUNCTION WITH SHEETS S0, S1, S1-1 & S3. FOR CONSTRUCTION
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
POMONA EXCHANGE
F SITE SPECIFIC NOTES - SHEET 2 OF 2 F
25 RAILWAY PARADE, POMONA, QLD 4568
DWG SHT S0-1
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 4
1 2 3 4 5 6
TN
RFNSA SITE No. 4568006
A A
RAIL
ROA
D PA EXISTING POWER ABOVE GROUND
RAD
E
EXISTING BUILDING (TYP.)
EXISTING BOUNDARY LINE
PROPOSED MOON FOOT PLATFORM.
REFER TO T2-1 FOR DETAILS
B PROPOSED 1.8m SATELLITE DISH B
MOUNTED ON PROPOSED 1.8m POLE.
REFER TO T2 FOR DETAILS
ACCESS GATE FOR
PROPOSED COMPOUND
PROPOSED TRENCHING FOR POWER,
FIBRE & EARTH TO BE APPROX. 21m. Copyright C Whereis R Registered Trademark of Sensis Pty Ltd.
REFER TO G4-4 FOR DETAILS
EXISTING TELSTRA LOCALITY PLAN
EXCHANGE BUILDING NOT TO SCALE
C C
10000
10475
ACCESS DRIVEWAY
PROPOSED TRENCHING
FOR EARTHING APPROX. EXISTING ACCESS GATE
8.6m. EARTHING
TSEB
SCENARIO 3 TO BE USED MISC
01
MISC
02
PGS2
03
T/DESK PGS1
05 04
MSB
08
ZONE 4
MDF BAR
ZONE 3
ZONE 2
ZONE 1 EXISTING SITE EARTH EXISTING ACCESS
3 24
DRIVEWAY
3 24 24
01 02 3 24
03 04 24
05 3 24
GRID
SSGL11/0 (B) 06 07 08
SSGL11/0 (E1) 09 10
TSEB
SSGL11/0 (E2) MISC MISC
PGS2 PGS1
20775
T/DESK
01 02 MSB
03 04
05
08
01 02 POME A
03 04 05 3
ZONE 4
24 3 24
MDF BAR
ZONE 3
24
ZONE 2
ZONE 1
01 02 3 24
SSGR2/1 03 24
05
06
3
04 24
SSGL11/0 (B) 06 07
OFDP (E1) 08
10
SSGL11/0 09
SSGL11/0 (E2)
POME A
SSN 07 08 01
OFDP
NGCF-AMS OLTE
02
SSN
03
(5 VERT's)
DDF
04
DDF
RESVD
05
06
ADM4C
MISC
07
RIM
RIM
08
RIM
09
12
3
SSGR2/1
3 24
11
10
(5 VERT's) 09 10 11
FM3785
SUPERSTRUCTURE
POME B
PCM
BASIC
POTS/BA
T1
PLANNED LOW
07
FAN ODF
08 09
10
SSGR2/0
DDF ADM4C 12 T2
FAN ODF
FAN ODF
FAN ODF
NGCF-AMS OLTE DDF RESVD
RIM 3 DWDM
LOD
OLT 4
DWDM
OLT 1
05
OM1664
OM1664
AM31
06
PJNAA
RECOVERED
PJNAD
ISMA
AM31
RESERVED
USE
DO NOT
07
08
M1(1)
R1(4)
POGAA
09
R1(2)
R1(3)
116/11
FRONT 116/10
N-1
UMUX HOD
3 24 PLANNED LOW
SUPERSTRUCTURE
8
FM3785
MISC 9
10
2
1
11
BATT BATT
RIM RIM
FM3785
SUPERSTRUCTURE
PLANNED LOW
POME B SSGR2/0
BASIC
POTS/BA PCM 07 08 09 10
EXISTING TELSTRA
T1 FAN ODF
T2 FAN ODF
FAN ODF
FAN ODF
PJNAA
05 POGAA
DWDM 06 07 116/11
OLT 4 OLT 1 08 09
OM1664 AM31
AM31
FRONT 116/10
LOD DWDM M1(1) RECOVERED RESERVED
USE
R1(2)
OM1664 PJNAD N-1
DO NOT ISMA R1(4) HOD
UMUX R1(3)
PLANNED LOW
SUPERSTRUCTURE
FM3785
2
BATT
8
1
BATT
9 10
11
EXCHANGE BUILDING
D D
RAILROAD PARADE
EXISTING BUILDING (TYP.) FACTORY STREET
EXISTING TREES (TYP.)
TN
EXISTING TREES OUTSITE
SITE BOUNDARY TO BE RETAINED SITE LAYOUT
SCALE 1:500
EXISTING GRASS TO BE RETAINED
5m 0 5m 10m 15m 20m 25m
SCALE 1:500
E SITE ACCESS E
NOTES : SCALE 1:5000
1. FOR SITE SPECIFIC NOTES REFER TO SHEETS S0 & S0-1. 50m 0 50m 100m 150m 200m 250m
SCALE 1:5000
2.
3.
FOR EME SIGNS NOTED AS #X REFER TO 005486 DOCUMENTS FOR DETAILS.
ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.
FOR CONSTRUCTION
TO BE READ IN CONJUNCTION WITH SHEETS S1-1 & S3.
4. THE PROPOSED EQUIPMENT TO BE PAINTED 'EUCALYPT GREEN'.
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SITE STRUCTURE CO-ORDINATES (GDA94)
GPS READING ACCURACY: ±xxm SATELLITE ACCESS NODE SITE 183929
CENTRE OF MAST/POLE/TOWER COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F LATITUDE -26.36068° (GDA94) SITE LAYOUT AND ACCESS F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT S1
LONGITUDE 152.85417° (GDA94) SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 5
1 2 3 4 5 6
TN SATELLITE
ORIENTATION 15.8°
A A
EXISTING SITE
EARTH GRID
PROPOSED SAN FENCING
TO BE PALE EUCALYPT
EXISTING TELSTRA
COLORBOND FENCING 3660
EXCHANGE BUILDING
80
PROPOSED MOON
B FOOT PLATFORM. REFER TO B
SHEET T2-1 FOR DETAILS
PROPOSED 1.8m
18272
SATELLITE DISH MOUNTED ON
PROPOSED 1.8m POLE. REFER
TO SHEET T2 FOR DETAILS
TSEB
6019
MISC MISC
01 02
C PROPOSED C
LANDSCAPING TO BE ZONE 4
INSTALLED. REFER TO
501-PL REV B FOR 3 24
1304
01
DETAILS
02
03
A SSGL11/0 (B)
01 02 03
OFDP
PROPOSED TRENCHING FOR NGCF-AMS OLT
E
SSN
(5 VERT's)
DDF
POWER & FIBRE. REFER TO
FM3785
PROPOSED TRENCHING SHEET G4-4 FOR DETAILS PLANNED LOW
SUPERSTRUCTUR
POME B
E
FOR EARTHING APPROX. BASIC
POTS/BA PCM
8.6m. EARTHING EXISTING GRASS TO T1
T2
D SCENARIO 3 TO BE USED BE RETAINED D
6048
21035 DWDM OLT 4 OLT 1
LOD DWDM
B SUPERSTRUCTUR
E
PLANNED LOWFM3785
E SITE LAYOUT E
CONDUIT SCHEDULE SCALE 1:100
1m 0 1m 2m 3m 4m 5m
SCALE 1:100
ITEM A B REMARKS
FOR CONSTRUCTION
POWER 23m N/A IN 50mm HD uPVC ELECTRICAL CONDUIT TO BE READ IN CONJUNCTION WITH SHEETS S1 & S3.
FIBRE 23m N/A IN P50 CONDUIT ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
EARTH N/A 8.6m 35mm² G/Y CABLE IN P32 CONDUIT 183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
NOTES : COMPLIANCE BOX POMONA EXCHANGE
1. FOR SITE SPECIFIC NOTES REFER TO SHEETS S0 & S0-1. COMPLETED AS PER DESIGN
F SITE LAYOUT F
2. FOR EME SIGNS NOTED AS #X REFER TO 005486 DOCUMENTS FOR DETAILS. ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
3. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED. NAME (PRINT)
DWG SHT S1-1
4. THE PROPOSED EQUIPMENT TO BE PAINTED 'EUCALYPT GREEN'. SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 A3
Page 6
1 2 3 4 5 6
A A
915mm x 1200mm MOON
FOOT PLATFORM
U/G POWER ROUTE IN 50mm 1
3
HD uPVC ELECTRICAL 2
305
CONDUIT. REFER NOTE 4
U/G FIBRE ROUTE IN
P50 CONDUIT.
4
REFER NOTE 4
B 4 B
WIDE H-FRAME
25 (M X)
1
75 (M
1 6 8 5
3660
1200
AZIMUTH 15.8° TN, 5.1° MN
IN)
A
BEAM ELEVATION: 58.2°
5 3
9
POWER, EARTH &
FIBRE IN SHARED
TRENCH. REFER 3 5 2
1830
C NOTE 4 C
TO NOMINATED EXCHANGE LOCATION
7
TO EXCHANGE CONNECTION POINT
1220 2
1170
TO TELSTRA ACTIVE EARTH
RESISTANCE
1220 1200
SECURITY FENCE POST.
3050
POST SPACING NOT TO
D 3965 EXCEED 3.0m (TYP.)
D
7620
CLIENT EQUIPMENT KEYED NOTES: ELECTRICAL SITE EQUIPMENT KEYED NOTES:
1 OAN CABINET W/ EXTERNAL AC UNIT 1 100A UTILITY METER (IF REQUIRED)
2 ELECTRONICS ENCLOSURE W/ SHROUD COVER SITE SETOUT PLAN 2 SIZE OF THE ENCLOSURE SHALL SUIT THE POWER UTILITY
REQUIREMENTS IN THE RELEVANT STATES AND TERRITORIES
SCALE 1:25
3 1.8m REFLECTOR W/ MODIFIED FEED BOOM & TRANSCEIVER
500 0 500 1000 3 100A LOAD CENTRE BOX W/ EXTERNAL SURGE PROTECTION DEVICE
SCALE 1:25
4 BOOM MOUNTED HP BUC (PREFERRED OPTION COMPOUND LAYOUT)
4 COTT WARNING MARKER (SUPPLIED BY CONTRACTOR)
E 5 FIBRE INTERFACE PANEL E
6 ACCESS NODE ASSEMBLY CABINET MFR. POWER CABLE
COMPLIANCE BOX 5 (2) STACKED SECTIONS OF UNISTRUT FOR CABLE PATHWAY
COMPLETED AS PER DESIGN
7 ACCESS NODE ASSEMBLY CABINET MFR. DATA CABLE ALTERATIONS IN RED
NAME (PRINT)
FOR CONSTRUCTION
8 OAN CABINET MFR. AC/DC POWER CABLES MFR. DATA CABLES TO BE READ IN CONJUNCTION WITH SHEETS S1, S1-1 & S3.
SIGNATURE DATE
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
9 ELECTRONICS ENCLOSURE MFR. DC POWER CABLES & MFR. DATA CABLES
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
NOTES : SATELLITE ACCESS NODE SITE 183929
1. REFER TO SHEET S0 FOR GENERAL NOTES.
2. SECURITY FENCE HEIGHT MUST BE MINIMUM 1.8m HIGH WITH POST SPACING NOT TO EXCEED 3.0m.
POMONA EXCHANGE
F 3. COMPOUND SHALL BE STRIPPED OF ALL VEGETATION & TOPSOIL. COMPOUND SHALL BE FINISHED WITH A LAYER OF SITE SETOUT PLAN F
GEOTEXTILE UNDERLYING (WEED MATTING). MINIMUM 100mm LAYER OF COMPACTED ROADBASE OR 20mm AGGREGATE. 25 RAILWAY PARADE, POMONA, QLD 4568
4. POWER, FIBRE AND EARTH DUCT TO USE SHORTEST DIRECT ROUTES (SHORTEST DISTANCE). DWG SHT S1-2
5. THE PROPOSED EQUIPMENT TO BE PAINTED 'EUCALYPT GREEN'. C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 A3
Page 7
1 2 3 4 5 6
CLIENT EQUIPMENT KEYED NOTES: TELSTRA ANTENNA CONFIGURATION TABLE
ANTENNA ANTENNA TYPE & ANTENNA ANTENNA ANTENNA SECTOR NO.
A 1 OAN CABINET W/ EXTERNAL AC UNIT 7 (2) ORANGE/WHITE DRIVEWAY MARKERS ATTACHED ONTO THE No ACTION HEIGHT BEARING & TECHNOLOGY A
SIZE H x W x D
CABLE PATHWAY UNISTRUT SECTION TO SERVE AS TRIP HAZARD REQUIRED C/L A.G.L. (x°T)
2 ELECTRONICS ENCLOSURE W/ SHROUD COVER MARKERS. 1200mm LONG MARKER. ATTACH TO BOTH UNISTRUT 15.8° TN BEAM ELEV: 58.2°
A1 1.8m BACKHAUL SATELLITE INSTALL 1.8m
SECTIONS WITH STAINLESS STEEL TIES. ONE MARKER ON EITHER 5.1° MN POINTING AT OPTUS D1 160° E
3 1.8m REFLECTOR W/ MODIFIED FEED BOOM & TRANSCEIVER
SIDE OF EQUIPMENT ENCLOSURE PAD
4 BOOM MOUNTED HP BUC
5 FIBRE INTERFACE PANEL
6 DISTRIBUTION BOARD
7620
B (OPTION 1 COMPOUND) B
4
3
℄ ANTENNA
1 7
5
2
6
1780
C C
1490
915mm x 1220mm MOON
FOOT PLATFORM W/
H-FRAME. REFER TO SHEET
T2-1 FOR DETAILS
385
625
D D
610
1400
COMPOUND FINISH. REFER
1530
SHEET S0 NOTE 7
ELECTRONICS ENCLOSURE
SUPPORT FOUNDATION. REFER TO
SHEET T2 FOR DETAILS
N12 x 450 LONG INSERTED THROUGH
SUPPORT POST. REFER TO SHEET 175
305
CHS TO PREVENT MAST ROTATION
T2 FOR DETAILS
E E
130
1000
EQUIPMENT ELEVATION
SCALE 1:25
500 0 500 1000
FOR CONSTRUCTION
SCALE 1:25 TO BE READ IN CONJUNCTION WITH SHEETS S1 & S1-1.
(FALL BACK OPTION COMPOUND LAYOUT) ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
NOTES : COMPLIANCE BOX POMONA EXCHANGE
1. FOR SITE SPECIFIC NOTES REFER TO SHEETS S0 & S0-1. COMPLETED AS PER DESIGN
F EAST ELEVATION F
2. FOR EME SIGNS NOTED AS #X REFER TO 005486 DOCUMENTS FOR DETAILS. ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
3. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED. NAME (PRINT)
DWG SHT S3
4. THE PROPOSED EQUIPMENT TO BE PAINTED 'EUCALYPT GREEN'. SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 Do Not Scale Drawing 4 5 Cad file: QC100259.dwg A3
Page 8
1 2 3 4 5 6
A A
B B
C C
D D
E E
FOR CONSTRUCTION
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
NOTE: COMPLIANCE BOX POMONA EXCHANGE
1. LOS PHOTOS SHOULD BE OBTAINED FROM ENDORSED SCIP OR SITE COMPLETED AS PER DESIGN
F LOS PHOTOS F
DESIGN VISIT AND MUST BE TAKEN FROM THE EXACT LOCATION OF ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
CENTRE OF MAST. NAME (PRINT)
DWG SHT S7
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 Do Not Scale Drawing 4 5 Cad file: QC100259.dwg A3
Page 9
1 2 3 4 5 6
NOTES (CONT'D): NOTES:
13. EARTH CABLE LUGS SHALL HAVE HEAT SHRINKS TO COVER 1. REFER TO DRAWING 017866P201 SHEET 1
A LUG BARREL EXTENDING OVER CABLE. FOR ADDITIONAL CONNECTION DETAILS. A
14. PROPOSED 35mm² G/Y INSULATED EARTH CABLES INSTALLED 2. ALL EARTH STRAPS TO BE 50 x 3mm HOT
WITHIN SAN COMPOUND AMONG EARTH BARS AND DIPPED GALVANISED MS FLAT AND LAID TO
FENCES/EARTH ELECTRODES SHALL RUN IN FLEXIBLE MINIMUM DEPTH OF 500mm.
GREY CONDUIT TO BE INSTALLED UNDER GEOTEXTILE MAT 3. TELSTRA EXCHANGE SITES WILL HAVE AN
AND 100mm COMPACTED ROAD BASE. EXISTING EARTHING SYSTEM PRESENT.
15. FENCE AND GATE POST CONNECTIONS ARE TO BE TREATED CHECK RECORDS FOR LOCATION. NOTE
WITH DENSO PASTE AND TAPE. THAT THERE MAY BE AN OBSOLETE SYSTEM
16. IF INTERCONNECTION OF SAN GROUND ROD TO TELSTRA IN SITU, TESTING WILL BE REQUIRED TO
GROUND/TOWER STRUCTURE EARTH IS COMPLEX/ ENSURE THAT EARTHING SYSTEM IS IN
TO MAST SEB DIFFICULT THEN TELSTRA EARTHING SHALL BE CONNECTED SERVICE.
DIRECTLY TO THE H FRAME GROUND BAR AS AN 4. SEB/SPC FOR SAN INSTALLATION SHALL BE
B ALTERNATIVE. CONNECTED TO EXISTING SERVICE EARTH B
VIA A BOLTED CONNECTION THAT CAN BE
BROKEN FOR EARTH SYSTEM TESTING. THE
BOND IS TO BE UNDERTAKEN EXTERNAL TO
COMPLIANCE BOX THE BUILDING AND MUST NOT RUN VIA
EQUIPMENT AREAS.
COMPLETED AS PER DESIGN
5. STANDARD ELECTRODES TO BE STAINLESS
ALTERATIONS IN RED STEEL CLAD ROD (S/I 446/16) 1440mm LONG
NAME (PRINT)
AT SPACING OF MINIMUM 2 ELECTRODES
SIGNATURE DATE
DEEP.
6. ALL ELECTRODES ARE TO BE INSTALLED AND
PLACED WITHIN P1/P2 INSPECTION PIT.
C 7. 19/1.53mm GREEN AND YELLOW COPPER C
UNISTRUT CABLE PATHS (2 OFF)
SHALL BE BONDED TO ANTENNA CABLE SHALL RUN FROM THE PROPOSED
SEB/SPC SHALL BE SEB/SPC FOR SAN INSTALL, TERMINATE AT
MAST EARTH BAR IN A PIGGY
MOUNTED AT LOWER
BACK ORIENTATION
LEGEND ELECTRODE AND CONTINUE TO EXISTING
LEVEL ON H-FRAME VIA SERVICE EARTH SYSTEM.
INSULATORS PROPOSED INSTALL 35mm² G/Y EARTH STRAP 8. REFER TO EARTHING GUIDELINES SHEET
EARTH CABLE IN CONDUIT. 35mm² G/Y INSULATED CABLE (19/1.53). G4-2 AND G4-3.
FENCE CONNECTION. ALSO REFER TO NOTE 16. 9. ALL CONNECTIONS TO EARTH ELECTRODES
REFER NOTE 11 EARTH INSPECTION PIT AND JOINTS ARE TO BE TREATED WITH
DENSO PASTE AND TAPE.
SITE FENCING 10. WHERE ELECTRODES CAN NOT BE DRIVEN
D EARTH ELECTRODE OR EARTH RESISTIVITY IS HIGH, DRILLING D
MAY BE REQUIRED. PRE-DRILLED HOLES
SERVICE EARTH BAR SEB SHALL BE BACK FILLED WITH EARTH
ENHANCING COMPOUND (E.G CALCIUM
BENTONITE AND GYPSUM SLURRY)
11. ALL FOUR FENCE CORNER POSTS SHALL BE
EARTH ELECTRODE SCHEDULE CONNECTED TO THE SAN EARTH.
35mm² G/Y CABLE IN 12. CABLES AND/OR CONNECTIONS FROM
TYPE DIAMETER QUANTITY DEPTH EXISTING TELSTRA EARTHING SYSTEM SHALL
FLEXIBLE GREY CONDUIT.
STAINLESS STEEL CLAD BE LABELLED IN RESPECTIVE EARTH PITS TO
REFER TO NOTE 14 14mm 2 2.88m
ROD IDENTIFY CONNECTION TO SAN EARTH.
EARTH GRID SCHEDULE ALL OTHER EARTH CABLES THAT CANNOT BE
E VISUALLY TRACED FROM SEB TO E
TYPE DIMENSIONS DESTINATION MUST ALSO BE LABELLED.
HOT DIPPED GALVANISED MS FLAT 50 x 3mm
NOTE: THIS DRAWING TO BE READ IN CONJUNCTION WITH SHEET G4-1
FOR CONSTRUCTION
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
PLAN VIEW SATELLITE ACCESS NODE SITE 183929
SCALE 1:25 POMONA EXCHANGE
F SITE EARTHING F
25 RAILWAY PARADE, POMONA, QLD 4568
DWG SHT G4
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 10
1 2 3 4 5 6
EARTHING GUIDELINES
A A
TELSTRA ACTIVE EARTH SAN EARTHING SAN EARTH RESISTANCE SAN (SEB) TO NEAREST TELSTRA SAN-TAE INTERCONNECTION SOLUTION DIAGRAM
RESISTANCE SYSTEM (ASSESSED ON ACTIVE EARTH (TAE) REFERENCE
(TAE) STATUS (TO BE INSTALLATION)
CHECKED PART OF SITE
VISIT TO DETERMINE SAN
EARTH SOLUTION AND
INTERCONNECTIVITY)
SCENARIO 3 <10 OHM 6m STRAP + 2* 2.88 >10 OHMS SAN (SEB) - TAE > 5 METRES YG DUCTED EARTH CABLE + 3
ELECTRODES (i.e X METRES) BURIED EARTH STRAP IN JOINT USE
TRENCH FOR X-5 METRES FROM THE TAE
B B
C C
D TELSTRA SERVICE EARTH
EARTHING SCENARIO D
SCALE 1:50
EXTENDED TO SITE.
5m
TELSTRA ANTENNA/STRUCTURE SITE > 5m FROM IN SPECIFICATION*
EARTH EXTENDED TELSTRA SERVICE EARTH.
SERVICE EARTH EXTENDED TO SITE VIA EARTH STRAP
> 5m
35mm² G/Y CABLE
IN CONDUIT
E GAL. STRAP EXTENDED E
TO WITHIN 5m OF SAN
LEGEND:
EARTH STRAP
ABOVE GROUND 16mm² EARTH
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET G4-3.
BELOW GROUND 35mm² EARTH ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
TELSTRA SERVICE EARTH.
BELOW GEOTEXTILE MAT, TELSTRA ANTENNA/STRUCTURE EARTH 183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
35mm² EARTH IN FLEX GREY CONDUIT
SATELLITE ACCESS NODE SITE 183929
EARTH INSPECTION PIT
COMPLIANCE BOX POMONA EXCHANGE
SITE FENCING COMPLETED AS PER DESIGN
F EARTHING SCENARIO F
EARTH ELECTRODE
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT G4-1
SERVICE EARTH BAR SEB SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 11
1 2 3 4 5 6
NOTES: GROUNDING SYMBOLS:
1. REFER TO SITE PLAN FOR LOCATION OF EQUIPMENT.
A 2. REFER TO SHEET G4-5 FOR EARTHING CONNECTIVITY. 16mm² INSULATED STRANDED COPPER CABLE A
(ABOVE GROUND)
35mm² INSULATED STRANDED COPPER CABLE
(UNDER GROUND)
COPPER TAPE - SIMILAR TO ERICO TCEC25325
6.35mm FIBRE BOX HOLES (ABOVE GROUND)
PREDRILLED TO SUIT GALVANISED 50mm x 3mm BAR.
(UNDER GROUND)
UNISTRUT STIFFENER TO BE
INSTALLED FROM AN OFF CUT 3
FROM THE CABLE UNISTRUTS
B ANTENNA B
SUPPORT POST
2.LNB
TRANSCEIVER
PLATFORM MOUNTED H-FRAME
(MOUNTED TO
B
SUPPORT POST)
AC DISTRIBUTION BOARD
(DRILL THROUGH 3. HPBUC
OAN CABINET
LOWER, RIGHT REAR
GROUND
OF AC DB TO INSTALL
EARTH LUG AND BOLT)
1.MAST
C C
C A 4. TXCVR
C
5. ELECTRONICS
RF ENCLOSURE
ABOVE GRADE
RECORD GROUND RESISTANCE
H-FRAME GROUND BAR (MOUNTED
750mm
MEASUREMENT USING A CLAMP-ON
D BELOW EQUIPMENT ON PLATFORM) 6. UNISTRUT x 2 GROUND RESISTANCE TESTER: D
ABOVE GRADE
RECORD GROUND RESISTANCE NOTIFY CLIENT PM IF RESISTANCE
370mm
MEASUREMENT USING A CLAMP-ON IS ABOVE 10 OHMS
GROUND RESISTANCE TESTER:
NOTIFY CLIENT PM IF RESISTANCE
IS ABOVE 10 OHMS FINISHED GRADE
IF INTERCONNECTION OF SAN GROUND ROD 35mm² STRANDED INSULATED
TO TELSTRA GROUND/TOWER STRUCTURE COPPER CABLE WITHIN FLEXIBLE
EARTH IS COMPLEX/ DIFFICULT THEN
TELSTRA EARTHING SHALL BE CONNECTED
NONMETALLIC CONDUIT
(SEAL EACH END)
COMPLIANCE BOX
DIRECTLY TO THE H FRAME GROUND BAR AS COMPLETED AS PER DESIGN
E AN ALTERNATIVE. ALTERATIONS IN RED E
SAN GROUND ROD SAN GROUND ROD NAME (PRINT)
SIGNATURE DATE
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET G4 & G4-1.
FOR CONSTRUCTION
TELSTRA GROUND OR ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
TOWER STRUCTURE
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
EQUIPMENT GROUNDING DIAGRAM SATELLITE ACCESS NODE SITE 183929
NOT TO SCALE
POMONA EXCHANGE
F SITE EARTHING SCHEMATIC F
25 RAILWAY PARADE, POMONA, QLD 4568
DWG SHT G4-2
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 12
1 2 3 4 5 6
ANTENNA SUPPORT POST
A GROUND BAR SITEPRO1
EQUIPMENT KEYED NOTES: A
#MG406U-K (MOUNTED 1 ANTENNA MAST
BELOW EQUIPMENT W/
INSULATORS & TOWER 2 LNB GROUND
STANDOFF BRACKET) 3 HPBUC (BOOM ARM)
DOUBLE STACK LUGS 4 TXCVR GROUND
1
5 ELECTRONICS ENCLOSURE GROUND
2
6 (2) STACKED SECTIONS OF
3 6 UNISTRUT FOR CABLE PATHWAY
B 4 B
5 TO SAN GROUND STAKE
370mm ABOVE GRADE RECORD GROUND RESISTANCE
INSTALLED ON EAST SIDE MEASUREMENT USING A CLAMP-ON
OF MAST (TYPICALLY ABOVE GROUND RESISTANCE TESTER:
UNISTRUT FOR STANDARD NOTIFY CLIENT PM IF RESISTANCE
SITES) IS ABOVE 10 OHMS
GROUND BAR CONNECTION DIAGRAM - ANTENNA SUPPORT
NOT TO SCALE
C C
B C C
EQUIPMENT KEYED NOTES:
A
A TO PROPOSED OAN CABINET
B TO PROPOSED RECEPTACLE POWER PANEL
C TO PLATFORM POSTS
D D
H-FRAME GROUND BAR SITEPRO1
#MG406U-K (MOUNTED BELOW
EQUIPMENT WITH INSULATORS)
RECORD GROUND RESISTANCE
COMPLIANCE BOX
COMPLETED AS PER DESIGN
MEASUREMENT USING A CLAMP-ON CONNECTION TO TELSTRA EXCHANGE
E ALTERATIONS IN RED E
GROUND RESISTANCE TESTER: TOWER EARTH OPTION, ONLY IF NAME (PRINT)
NOTIFY CLIENT PM IF RESISTANCE TO SAN GROUND STAKE UNDERGROUND SAN EARTH TO SIGNATURE DATE
IS ABOVE 10 OHMS EXCHANGE EARTH NOT PRACTICAL
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET G4 & G4-1.
FOR CONSTRUCTION
GROUND BAR CONNECTION ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
DIAGRAM - H-FRAME SATELLITE ACCESS NODE SITE 183929
NOT TO SCALE
POMONA EXCHANGE
F BAR CONNECTIONS DIAGRAMS F
25 RAILWAY PARADE, POMONA, QLD 4568
DWG SHT G4-3
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 13
1 2 3 4 5 6
A A
B B
COMPOUND FINISH
MIN.
500
COMPACTED SELECT
C BACKFILL C
Ø50 FIBRE CONDUIT
Ø50 POWER CONDUIT
50
SAND BEDDING
100
300
D D
TRENCH DETAILS
SCALE 1:10
E E
FOR CONSTRUCTION
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F TRENCH DETAILS F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT G4-4
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 14
1 2 3 4 5 6
NOTES:
PROPOSED SAN MAIN SWITCH
1. ALL LOW VOLTAGE AND ELECTRICAL INSTALLATION
A IN PROPOSED SAN DB ON A
SHALL BE IN ACCORDANCE WITH THESE SPECIFICATION,
EXTERNAL WALL OF TELSTRA
TELSTRA CIVIL DESIGN MANUAL, TELSTRA EARTHING
32A/1P EXCHANGE BUILDING - TO BE
MANUAL, ALL REFERENCED TELSTRA STANDARD
BY TELEPOWER INSTALLED BY TELEPOWER
DOCUMENTATION ALONG WITH AS/NZS3000, AS/NZS3008,
AS/NZS3015, AS/NZS3017, AS/NZS1768, AS/ACIF S006,
RELEVANT STATE/TERRITORY SPECIFIC INSTALLATION PROPOSED 2C+E 10mm² MAINS.
RULES AND ALL OTHER RELEVANT AUSTRALIAN APPROX. CABLE RUN 30m
BY SAN TEAM
STANDARDS AS APPLICABLE TO PROPOSED WORKS.
2. ALL LOW VOLTAGE AC POWER WORKS SHALL BE
COMPLETED BY LICENSED ELECTRICIAN IN ISOLATOR INSIDE DISTRIBUTION SURGE PROTECTION DEVICE SIMILAR
ACCORDANCE WITH INSTALLATION RULES AND 100A, 1PH, 240V, 12 POLE BOARD TO CLIPSAL 4AFRC225 IN AN EXTERNALLY
B RELEVANT SAFETY PRACTICES APPLICABLE TO SITE. DISTRIBUTION BOARD B
MOUNTED ENCLOSURE ON THE H-FRAME
3. ALL WORKS SHALL BE LIAISED AND COORDINATED WITH IP56 RATED. LOCKABLE. ADJACENT TO DISTRIBUTION BOARD
RELEVANT PERSONNEL, SITE REPRESENTATIVES, 100A,1PH
LANDOWNER, SITE PROVIDER AND/OR POWER ISOLATOR
AUTHORITY AS APPLICABLE.
4. ALL WORKS SHALL BE AS PER TELSTRA SPECIFICATIONS 32A
AND APPROVED MOPS INCLUDING LABELLING. SPARE MCB SURGE PROTECTION DEVICE
5. CONTRACTOR SHALL MAKE THEMSELVES AWARE OF ALL 20A 32A WITH FAIL INDICATION
RCBO RCBO SPACES
SITE CONDITIONS AND SAFETY REQUIREMENTS PRIOR
TO COMMENCING ANY WORK ON SITE.
6. CONTRACTOR TO VALIDATE ALL APPROVALS AND POWER
POWER
OUTAGES REQUIRED TO CONDUCT PROPOSED WORKS. OUTLET
OUTLET
C THIS INCLUDES BUT IS NOT LIMITED TO ANY DONOR C
SITES AND/OR FAR END SITES WHICH MAY BE IMPACTED
DUE TO PROPOSED WORKS. POWER PLUG
7. ALL CONTRACTORS WORKING ON TELSTRA FACILITIES (AUSTRALIAN STANDARD)
SHALL BE TELSTRA ACCREDITED AS PER TELSTRA MFR. AC SATELLITE DISH
PROTOCOLS. POWER CABLE ANTENNA
8. ALL LV CABLES SHALL BE INSTALLED IN CONDUITS. ANY PDU/ (XCVR, HP BUC,
EXPOSED CONDUITS SHALL BE UV PROTECTED. POWER SUPPLY LNB & FEED)
9. NO SEPARATE METERING IS REQUIRED FOR SAN MFR. AC POWER CABLE MFR. DC MFR. DC
INSTALLATION UNLESS SPECIFIED AND DIRECTED BY POWER CABLE POWER CABLE
FIBER
TELSTRA.
EQUIPMENT MFR. DC
10. NEUTRAL AND ELECTRICAL SAFETY EARTH FOR SAN
D INSTALLATION SHALL BE TAKEN FROM EXCHANGE POWER CABLE D
EXISTING M.E.N. MFR. TLM
CONDUIT W/ CABLES
FIBER
OAN CABINET
(CABLE MANAGEMENT HOOD/AC UNIT
NOT SHOWN FOR CLARITY)
FIBER INTERFACE MFR. AC DATA CABLE ELECTRONICS
E PANEL ENCLOSURE E
(AT H-FRAME)
AC POWER CONNECTION
NOT TO SCALE
FOR CONSTRUCTION
FOR SITE SPECIFIC NOTES REFER TO SHEET S0.
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F AC POWER CONNECTION F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT E2
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 15
1 2 3 4 5 6
A FHR A
RAC RAC RAC
18m TO MDF
L2 B1 Z04
UNCRATING
29
113
112
111
117
116
115
114
PLANNED LOW SUPERSTRUCTURE
01
121
RESERVED FOR NBN Co
NGCF-AMS OLTE
RESERVED FOR NBN Co
OFDP
POTS/BA
BASIC
01
01
3
PLANNED LOW SUPERSTRUCTURE
DWDM
LOD
29
02
T1
B B
FM3785
TSEB
MISC
01
SSN
02
POME B
02
ZONE 4
SSGL11/0 (B)
PCM
DWDM
OLT 4
CABLE
03
24
MISC
02
FM3785
(5 VERT's)
03
DDF
OLT 1
04
T2
DATA GATES
03
PGS2
ABOVE
03
45
04
RACKS
3 24
ZONE 3
MDF BAR
LL ADSL
OM1664
RECOVERED RESERVED OM1664
04
PJNAC/
RESVD
PJNAB
T/DESK PGS1
C8SL
DDF
05
04
05
SSGL11/0 (E1)
05
DO NOT
AM31
C C
USE
ADM4C
05
06
MISC
POME A
PJNAA
24
06
RESERVED FOR NBN Co
34
R1(4) PJNAD
07
ZONE 2
AM31
ISMA
CPE
07
FAN ODF
FAN ODF
RESERVED FOR NBN Co
RIM
RIM
06
07
BATT
8
ROOM
2
M1(1)
3 24
08
08
RIM
POGAA
07
08
BATT
MSB
9
1
08
25
UMUX R1(3)
R1(2)
09
08
09
FAN ODF
FAN ODF
ZONE 1
SSGL11/0 (E2)
09
10
24
116/10
D D
10
10
N-1
3
WC
SSGR2/1
SSGR2/0
31
09
FRONT
11
116/11
HOD
11
3 24
3 24
10
AIR
12
118
1670 1630 LOCK
INFORMATION TAKEN FROM
TELSTRA TE DRAWING
QC100259 - SHEET 1, ISSUE No. 26
LUNCH
E ROOM E
EQUIPMENT LAYOUT FIP
SCALE 1:50
500 0 500 1000 1500 2000 2500
FOR CONSTRUCTION
SCALE 1:50 FOR SITE SPECIFIC NOTES REFER TO SHEET S0.
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
NOTES:
1. ALL DIMENSIONS IN BRACKETS ARE MILLIMETRES. ALL OTHER SATELLITE ACCESS NODE SITE 183929
DIMENSIONS ARE BUILDING MODULES (BM) 1BM = 40.64mm. COMPLIANCE BOX POMONA EXCHANGE
2. DRAWN AS A SECTIONAL ELEVATION TO SHOW ORIENTATION COMPLETED AS PER DESIGN
F TE/RT CONSTRUCTION WORKS F
OF U-BARS. DIMENSIONS SHOWN ARE FROM CENTRELINE OF ALTERATIONS IN RED
DRILLED HOLES. 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT E6
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 16
1 2 3 4 5 6
GENERAL NOTES:
REFER SITE-SPECIFIC DRAWINGS FOR SET-OUT DIMENSIONS GENERAL
A G1. THIS DRAWING TO BE READ IN CONJUNCTION WITH SITE-SPECIFIC DRAWINGS. A
G2. FOR GENERAL CONSTRUCTION & FABRICATION NOTES REFER TO TELSTRA STANDARD
DRAWING 017866P05.
PEDESTAL 'A'. G3. FOOTINGS TO BE FOUNDED ON UNDISTURBED, NATURALLY CONSOLIDATED SOIL WITH
REFER DETAIL MINIMUM ALLOWABLE VERTICAL BEARING CAPACITY 100kPa (U.N.O). A SUITABLY
EXPERIENCED PERSON SHALL CONFIRM THE BEARING CAPACITY ON-SITE PRIOR TO
INSTALLING THE CONCRETE/EQUIPMENT.
G4. BASE OF EXCAVATION SHALL BE CLEAN, FLAT & FREE OF SOFT/ORGANIC MATERIAL.
G5. SUBGRADE OF CRUSHED AGGREGATE OR ROAD BASE SHALL BE USED AS NECESSARY
TO ACHIEVE THE BEARING CAPACITY REQUIREMENT.
G6. CONCRETE 5-10mm BELOW TOP OF POLE. ENSURE TOP OF POLE IS WIPED CLEAN.
MOON FOOT G7. SAFE WORK PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE WITH LOCAL
B PLATFORM. REFER PEDESTAL 'B'. REGULATORY REQUIREMENTS & AS2159-2009. B
SHEET T2-1 REFER DETAIL MOUNTING POLE
Ø168.3 x 7.1 CHS CONCRETE
(GR350). REFER NOTE G6 C1. CONCRETE WORKS TO BE COMPETED IN ACCORDANCE WITH AS3600-2018.
C2. CONCRETE STRENGTH TO BE MIN f'c = 32MPa AT 28 DAYS.
C3. COVER TO REINFORCEMENT TO BE MIN. 75mm (TYP ALL SIDES).
C4. CAST-IN PROPRIETARY ITEMS TO BE INSTALLED TO MANUFACTURERS
TYPICAL COMPOUND - PLAN VIEW SPECIFICATIONS.
SCALE 1:50
STEEL
Ø1000 MOUNTING POLE CAST INTO FOOTING S1. STEELWORK TO BE FABRICATED IN ACCORDANCE WITH AS4100-2020.
1650
S2. ALL STEELWORK TO BE HOT DIP GALVANISED TO AS4680-2006 U.N.O.
C N12 x 450 LONG INSERTED THROUGH S3. ALL HOLLOW SECTIONS TO BE GRADE 350 TO AS1163-2016 U.N.O. C
CHS TO PREVENT MAST ROTATION
MASS CONCRETE FOOTING
A 1% FALL TOWARDS EDGES TYP.
- CRUSHED ROCK COMPOUND FINISH
3050
450 E.L. 0.0m
FINISHED GRADE
MASS CONCRETE
FOOTING
D
PEDESTAL 'A' - PLAN VIEW D
SCALE 1:25 BACKFILL MOUNTING
SL72 MESH (ALL SIDES)
POLE WITH
1400
610 NOM.
CONCRETE CONCRETE PEDESTAL
385
(600 MIN.; 615 MAX.)
1530
6 HOLD-DOWN BOLTS TO BE
E.L. 0.0m
CHEMICALLY SET INTO TOP OF
845
N12 x 450 LONG FINISHED GRADE
PEDESTAL AT TIME OF ACTIVE KIT INSERTED THROUGH
460
INSTALLATION CHS TO PREVENT
175
MAST ROTATION
305
REFER NOTES G3,
SL72 MESH (ALL SIDES)
130
G4 & G5
B
E -
CONCRETE PEDESTAL
SECTION A REFER NOTES G3,
G4 & G5
SECTION B E
SCALE 1:25 - SCALE 1:25 -
ORIENTATE HOLD-DOWN BOLTS
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2-1.
TO BE PARALLEL WITH UNISTRUT
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX
75 MAX.
25 MIN.
UNISTRUT (REFER SITE LAYOUT)
POMONA EXCHANGE
COMPLETED AS PER DESIGN
F CONCRETE FOUNDATION DETAILS F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
PEDESTAL 'B' - PLAN VIEW NAME (PRINT)
DWG SHT T2
SCALE 1:10
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 17
1 2 3 4 5 6
A A
BACK PLATE TO SUPPORT
METER PANEL, DISTRIBUTION
BOARD AND FIBRE BOX,
SHALL BE MINIMUM
1500mm WIDE x 800mm HEIGHT
2
UNISTRUT STIFFENER TO BE
INSTALLED FROM AN OFF CUT
B FROM THE CABLE UNISTRUTS B
H-FRAME INSTALLED IN
ACCORDANCE WITH
MANUFACTURER SPECIFICATIONS
1
625
725
1 MIN 100 THICK COMPOUND FINISH
C C
FINISHED GRADE
3
PREPARE GROUND BELOW PLATFORM
FEET IN ACCORDANCE WITH SHEET T2
NOTES G3, G4 & G5.
GROUND PREPARATION SHALL BE
D EQUIPMENT PLATFORM - H-FRAME DETAIL COMPLETED BELOW PLATFORM FEET TO
ACHIEVE 150kPa ALLOWABLE VERTICAL H-FRAME FOUNDATION D
NTS SCALE: 1:20
BEARING CAPACITY
CLIENT EQUIPMENT KEYED NOTES:
1 FIBRE INTERFACE PANEL
E E
2 OAN CABINET W/ EXTERNAL AC UNIT
3 EQUIPMENT GROUND BAR
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2.
ELECTRICAL SITE EQUIPMENT KEYED NOTES: ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
1 100A DISTRIBUTION BOARD WITH INTERNAL SURGE
PROTECTION DEVICE SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F EQUIPMENT PLATFORM - H-FRAME DETAIL F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT T2-1
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 18
1 2 3 4 5 6
CLIENT EQUIPMENT KEYED NOTES:
A A
1 ELECTRONICS ENCLOSURE W/ SHROUD COVER
1
FOUNDATION CIRCULARITY MEASURED 12.5mm
1 BELOW THE TOP SURFACE SHALL BE:
MIN. 2-M12 4.6/S CHEMSET REO 615mm MAX SL72 WELDED MESH
502 ANCHORS THROUGH HOLES 600mm MIN
IN H FRAME BASEPLATE. ALLOW CONTRACTOR
FOR 80x80x6 THICK WASHERS RECORD: SUPPLIED AND
(TYP) MIN. EMBED 110mm. MIN. MAX CIRCULARITY: ______________________ INSTALLED EQUIPMENT
B EDGE DISTANCE 50mm. INSTALL SUPPORT/CONCRETE B
MIN CIRCULARITY: ______________________
385mm
STRICTLY IN ACCORDANCE WITH REINFORCEMENT CAGE
MANUFACTURER SPECIFICATION
MAX 150mm THICK
625
MAX 20mm HIGH STRENGTH NON
75 (T
985mm
mm YP
SHRINK GROUT UNDER
CL )
BASEPLATE
FINISHED GRADE
EA
600mm
R
400x400x300DP PAD FOOTINGS, SL72 WELDED MESH
3-N12 E.W BOTTOM BARS
COGGED AT ENDS 150mm. 150mm THICK
MINIMUM COVER 75mm
C CONCRETE C
75mm CLEAR
(TYP)
610mm
CLIENT EQUIPMENT KEYED NOTES: UNDISTURBED SOIL OR
PREPARED SUBGRADE
1 OAN CABINET W/ EXTERNAL AC UNIT
TOP VIEW
OAN EQUIPMENT CABINET PLATFORM EQUIPMENT PLATFORM DETAIL ELECTRONIC ENCLOSURE FOUNDATION SUPPORT DETAIL
NTS NTS
D D
E E
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2.
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F FOUNDATION DETAILS - CYCLONIC WIND ZONES F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT T2-2
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
Page 19
1 2 3 4 5 6
A DN 50 LINE POST DN 80 A
OUTER FRAME DN32 DN 80 GATE POST
CORNER END
GAUGE PIPE
POST
DN32 PIPE
2.5 mm 50 PITCH KB
FENCE FABRIC WITH LOCKING MECHANISM. GALVANISED
BARBED TOP SELVEDGE REFER NOTE 4 TENSION WIRE
1800
B SUPPORT CABLE B
HANDHOLE
DN32
DN32 PIPE
FENCE POST EARTHING.
50mm GAP BETWEEN REFER DRAWING
C FABRIC AND GRAVEL C
017866P201 SHEET 1
900
CONCRETE FOOTING
COMPOUND FINISH CONCRETE FOOTING
Ø300 Ø300
MAX. 3m CTS SPACINGS
1220
GATE OPENING
D TYPICAL FENCE DETAILS GATE DETAILS D
SCALE 1:25 SCALE 1:25
NOTES:
1. POSTS TO BE SPACED 3m CTS MAX. SET IN CONCRETE HAVING A MIN. COMPRESSION STRENGTH
M12 OF 20 MPa @ 28 DAYS. CROWN TO SHED WATER. FOOTING SIZE TO BE Ø300mm x 900mm DEEP MIN.
GAL OR AS REQUIRED BY LOCAL CODE AND DESIGN CONSIDERATIONS.
BOLT 2. ALL MATERIALS TO BE GALVANISED AND COMPLY WITH CLASS 1 SECURITY QUALITY OF AS1725.1.
GATE POST
3. GATE SHALL HAVE LATCH FORK WITH LOCKING MECHANISM (PADLOCK ACCEPTED).
SECTIONAL VIEW 4. FENCE AND GATE POST EARTH CONNECTIONS ARE TO BE TREATED WITH DENSO PASTE AND TAPE.
E ENLARGED SCALE E
HINGE
REFER NOTE 5 FOR CONSTRUCTION
GATE
TINNED COPPER ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
BRAID (MIN. 35mm²) 183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
19/1.53 G/Y SATELLITE ACCESS NODE SITE 183929
COPPER CABLE
FITTED WITH LUGS
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F COMPOUND FENCE AND GATE DETAILS F
ALTERATIONS IN RED
FENCE & GATE DETAILS NAME (PRINT)
25 RAILWAY PARADE, POMONA, QLD 4568
NOT TO SCALE DWG SHT T8
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3