Original source · versioned page text
QC100259_Pomona Exchange_DD_Rev01-220630
Attached to the e-mail Operational Works Application OP"W22/0174 - DA Form 1 & 2 - Plans - 25 Railway Pde, Pomona.
1 2 3 4 5 6
GENERAL NOTES:
REFER SITE-SPECIFIC DRAWINGS FOR SET-OUT DIMENSIONS GENERAL
A G1. THIS DRAWING TO BE READ IN CONJUNCTION WITH SITE-SPECIFIC DRAWINGS. A
G2. FOR GENERAL CONSTRUCTION & FABRICATION NOTES REFER TO TELSTRA STANDARD
DRAWING 017866P05.
PEDESTAL 'A'. G3. FOOTINGS TO BE FOUNDED ON UNDISTURBED, NATURALLY CONSOLIDATED SOIL WITH
REFER DETAIL MINIMUM ALLOWABLE VERTICAL BEARING CAPACITY 100kPa (U.N.O). A SUITABLY
EXPERIENCED PERSON SHALL CONFIRM THE BEARING CAPACITY ON-SITE PRIOR TO
INSTALLING THE CONCRETE/EQUIPMENT.
G4. BASE OF EXCAVATION SHALL BE CLEAN, FLAT & FREE OF SOFT/ORGANIC MATERIAL.
G5. SUBGRADE OF CRUSHED AGGREGATE OR ROAD BASE SHALL BE USED AS NECESSARY
TO ACHIEVE THE BEARING CAPACITY REQUIREMENT.
G6. CONCRETE 5-10mm BELOW TOP OF POLE. ENSURE TOP OF POLE IS WIPED CLEAN.
MOON FOOT G7. SAFE WORK PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE WITH LOCAL
B PLATFORM. REFER PEDESTAL 'B'. REGULATORY REQUIREMENTS & AS2159-2009. B
SHEET T2-1 REFER DETAIL MOUNTING POLE
Ø168.3 x 7.1 CHS CONCRETE
(GR350). REFER NOTE G6 C1. CONCRETE WORKS TO BE COMPETED IN ACCORDANCE WITH AS3600-2018.
C2. CONCRETE STRENGTH TO BE MIN f'c = 32MPa AT 28 DAYS.
C3. COVER TO REINFORCEMENT TO BE MIN. 75mm (TYP ALL SIDES).
C4. CAST-IN PROPRIETARY ITEMS TO BE INSTALLED TO MANUFACTURERS
TYPICAL COMPOUND - PLAN VIEW SPECIFICATIONS.
SCALE 1:50
STEEL
Ø1000 MOUNTING POLE CAST INTO FOOTING S1. STEELWORK TO BE FABRICATED IN ACCORDANCE WITH AS4100-2020.
1650
S2. ALL STEELWORK TO BE HOT DIP GALVANISED TO AS4680-2006 U.N.O.
C N12 x 450 LONG INSERTED THROUGH S3. ALL HOLLOW SECTIONS TO BE GRADE 350 TO AS1163-2016 U.N.O. C
CHS TO PREVENT MAST ROTATION
MASS CONCRETE FOOTING
A 1% FALL TOWARDS EDGES TYP.
- CRUSHED ROCK COMPOUND FINISH
3050
450 E.L. 0.0m
FINISHED GRADE
MASS CONCRETE
FOOTING
D
PEDESTAL 'A' - PLAN VIEW D
SCALE 1:25 BACKFILL MOUNTING
SL72 MESH (ALL SIDES)
POLE WITH
1400
610 NOM.
CONCRETE CONCRETE PEDESTAL
385
(600 MIN.; 615 MAX.)
1530
6 HOLD-DOWN BOLTS TO BE
E.L. 0.0m
CHEMICALLY SET INTO TOP OF
845
N12 x 450 LONG FINISHED GRADE
PEDESTAL AT TIME OF ACTIVE KIT INSERTED THROUGH
460
INSTALLATION CHS TO PREVENT
175
MAST ROTATION
305
REFER NOTES G3,
SL72 MESH (ALL SIDES)
130
G4 & G5
B
E -
CONCRETE PEDESTAL
SECTION A REFER NOTES G3,
G4 & G5
SECTION B E
SCALE 1:25 - SCALE 1:25 -
ORIENTATE HOLD-DOWN BOLTS
FOR CONSTRUCTION
THIS SHEET TO BE READ IN CONJUNCTION WITH SHEET T2-1.
TO BE PARALLEL WITH UNISTRUT
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX
75 MAX.
25 MIN.
UNISTRUT (REFER SITE LAYOUT)
POMONA EXCHANGE
COMPLETED AS PER DESIGN
F CONCRETE FOUNDATION DETAILS F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
PEDESTAL 'B' - PLAN VIEW NAME (PRINT)
DWG SHT T2
SCALE 1:10
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.