Appendix C - Stormwater Management Plan

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                Table 3.2 Existing and proposed mitigated site peak discharge rates

                                                                   Wyandra Street
                                                                                                    Qchange
                                            A.E.P           Qexisting   Qproposed      Qchange       (%)
                                                            (m³/s)      (m³/s)         (m³/s)
                                             1EY             0.044       0.044          0.000         0%
                                             50%            0.051          0.050       -0.001         -2%
                                           0.2 EY           0.080          0.076       -0.004         -5%
                                             10%            0.095          0.091       -0.004         -4%
                                              5%            0.112          0.104       -0.008         -7%
                                              2%            0.129          0.123       -0.006         -5%
                                              1%            0.150          0.140       -0.010         -7%



Under the proposed conditions, the existing 250mm stormwater pipe was found to be capable of
conveying the peak flows generated from the existing and proposed development without exceeding the
required freeboard of the existing pit as shown below in Figure 3.6 – Peak 1% Developed Flow in Existing
250mm PVC pipe. The existing point of discharge therefore has adequate capacity to carry the peak
attenuated flows resulting from the development.




                                 Figure 3.6 – Peak 1% Developed Flow in Existing 250mm PVC pipe




Project number 20220213
File 20220213 Reserve St SWMP.docx, 2022-09-19 Revision 1                                                       Page 10 of 16

P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads,Qld 4567           E [email protected]    recorconsulting.com
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.