Appendix C - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Table 3.2 Existing and proposed mitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.044 0.044 0.000 0%
50% 0.051 0.050 -0.001 -2%
0.2 EY 0.080 0.076 -0.004 -5%
10% 0.095 0.091 -0.004 -4%
5% 0.112 0.104 -0.008 -7%
2% 0.129 0.123 -0.006 -5%
1% 0.150 0.140 -0.010 -7%
Under the proposed conditions, the existing 250mm stormwater pipe was found to be capable of
conveying the peak flows generated from the existing and proposed development without exceeding the
required freeboard of the existing pit as shown below in Figure 3.6 – Peak 1% Developed Flow in Existing
250mm PVC pipe. The existing point of discharge therefore has adequate capacity to carry the peak
attenuated flows resulting from the development.
Figure 3.6 – Peak 1% Developed Flow in Existing 250mm PVC pipe
Project number 20220213
File 20220213 Reserve St SWMP.docx, 2022-09-19 Revision 1 Page 10 of 16
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.