Appendix C - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
Table 3.1 Existing and proposed unmitigated site peak discharge rates
Wyandra Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
1EY 0.044 0.048 0.004 9%
50% 0.051 0.054 0.003 6%
0.2 EY 0.080 0.091 0.011 14%
10% 0.095 0.098 0.003 3%
5% 0.112 0.111 -0.001 -1%
2% 0.129 0.137 0.008 6%
1% 0.150 0.154 0.004 3%
The increased impervious area resulting from the development will increase in overall peak site run-off rates.
Attenuation will therefore be required to mitigate the increased peak flows to ensure that there is no impact that
may result in nuisance to downstream properties and infrastructure. The site model was therefore updated to
include an attenuation storage through which run-off from the new roof area will be drained before being discharged
to the existing pit. The modified layout to assess attenuation is shown below in
Figure 3.5 – DRAINS Post-development Layout
Figure 3.5 – DRAINS Post-development Layout with Attenuation
An iterative process was used to determine a suitable combination of attenuation storage and low-flow and high-
flow outlets that would restrict the developed flows to at or below existing peak flow rates. It was found that a 3KL
attenuation volume (e.g. Aquaslim Square 3008 or similar) would provide sufficient capacity with a 50mm low flow
orifice place at its base outlet and a 150mm overflow at the top of the tank. This configuration of attenuation would
sufficiently reduce peak flows to below existing flow rates, as shown in Table 3.2 Existing and proposed mitigated
site peak discharge rates.
Project number 20220213
File 20220213 Reserve St SWMP.docx, 2022-09-19 Revision 1 Page 9 of 16
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.