Council archive · source document
plans · MCU19/0088.02
Plans and drawings: the text below has words only, no drawings.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
DA
NOT FOR CONSTRUCTION
EXISTING DOWNIPE SECTION OF PARAPET BOX GUTTER TO EXISTING DOWNIPE
AND SUMP TO BE CAPPING TO BE REMOVED BE DEMOLISHED AND SUMP TO BE
REMOVED AND REMOVED REMOVED
A B C D E F G H J
BG
DP DP
DP DP BG
1 BG BG
*ex 1°
*ex 2°
BG
BG
2
*ex 1°
*ex 2°
3
4 *ex 2°
DP
5 BG BG
DP
D Minor Change MT 08.02.21
EXISTING HOTEL C DA Issue JC 30.05.19
B Revised Client Issue JC 15.04.19
A Preliminary DA Issue JC 11.04.19
issue revision initials date
Cayas
Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
p 07 3356 6100 e [email protected]
Roof Demolition Plan
1 1 : 100
client ALH Group
project Villa Noosa Hotel - Dan
Murphy's
drawing title Roof Demolition Plan
drawn JC
date February '19
scale 1 : 100@A1
project no. drawing number issue
1905 A12.01 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.