Council archive · source document
plans · MCU19/0088.02
Plans and drawings: the text below has words only, no drawings.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
DA
NOT FOR CONSTRUCTION
A B C D E F G H J
A20.01
2
1
A30.00
NEW BOX GUTTER NEW PARAPET CAPPING
TO H.E'S DETAIL
DP DP
DP
NEW DOWNPIPE BG BG
AND SUMP TO
H.E'S DETAIL
NEW ROOF SHEETING
2°
TO MATCH EXISTING
ADJACENT
LINE INDICATES
THRESHOLD
BETWEEN NEW AND
EXISTING ROOF (e)BG
SHEETING
DP
(e)DP
(e)DP (e)BG
1 (e)BG
*ex 1°
*ex 2°
(e)BG
(e)BG
2
*ex 1°
*ex 2°
A20.01 3
3
1 A20.01
4 *ex 2°
(e)DP
(e)BG (e)BG
5
(e)DP
D Minor Change MT 08.02.21
EXISTING HOTEL C DA Issue JC 30.05.19
B Revised Client Issue JC 15.04.19
A Preliminary DA Issue JC 11.04.19
issue revision initials date
Cayas
Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
p 07 3356 6100 e [email protected]
2°
client ALH Group
NEW METAL PARAPET
CAPPING TO SCHEDULE
project Villa Noosa Hotel - Dan
Murphy's
NEW METAL ROOF
SHEETING TO
SCHEDULE TO MATCH drawing title Proposed Roof Plan
EXISTING ADJACENT
drawn JC
date February '19
scale 1 : 100@A1
NEW EAVES GUTTER
TO H.E'S DETAIL
Proposed Roof Plan 2
4
project no. drawing number issue
1 1 : 100 A30.00
A20.01 1905 A12.02 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.