450x450mm WEATHER PROOF LOUVRE
NO WORKS DA
ABOVE AS PER MECH DWG. NOT FOR CONSTRUCTION
GENERAL NOTES:
(These notes apply to all drawings)
20 6305 20170
Higher Parapet CONC. PANEL - These designs, drawings and specifications
20 3230 20 3055 20 are copyright and the property of Cayas
9.500 SI(ex) NEW METAL PARAPET CAPPING
Lower Parapet Architects and must not be used, reproduced
or copied wholly or in part without the
8.600 permission of Cayas Architects.
560
OVERFLOR SPITTER TO HYDRO. - Do not scale - use figured dimensions in
2350
SI (ex) ENG. DETAIL preference to scaled dimensions.
- All dimensions must be checked on site prior
N
(ex)DP
R
VE
NEW DOWNPIPE AND SUMP TO to the commencement of construction and/or
TA
6700
ING H.E'S DETAIL manufacture of any item.
600 600
DP
IST
5800
- Where demolition work is included, allow to
EX
makegood all affected surfaces.
- Ensure that all conditions of the building
certification are complied with.
1200
SI
D Where ambiguities or discrepencies exist,
03
Cayas Architects shall be contacted for
(ex) (ex) (ex) (ex) (ex) (ex)
1050
BOL-F BOL-F BOL-F BOL-F BOL-F BOL-F
clarification or it will be deemed that the more
Ground FFL BOL-F BOL-F expensive option has been allowed.
2.800 - All work is to comply with all relevant sections
of the NCC and/or Austalian Standards.
EXTERNAL TROLLEY 6 PANEL HEIGHTS TO MATCH - These drawings are to be read in conjunction
CORAL BY BUILDER. EXISTING - COS with all other documentation, schedules &
Proposed East Elevation REFER DETAIL.
A40.16
1 1 : 100 GROUPED LINES TO INDICATE
PANEL JOINTS
consultant documentation.
The contractor is to allow for all neccessary
floor preperation works.
5950 20 5670 20 5410 20 5410 20 5630
- Provide all warranties as per the
CONC. PANEL CONC. PANEL CONC. PANEL CONC. PANEL CONC. PANEL manufacturers & suppliers standard warranties.
2980 20 2950 20 2950 20 2700 20 EQ. EQ. EQ. 20 EQ. EQ. EQ. 20 EQ. EQ. EQ. - All materials, equipment, fixtures, fittings, etc.
shall be new first quality without exception.
Supply, delivery, storage, installation, etc. is to
NEW DOWNPIPE AND SUMP NEW METAL PARAPET CAPPING GROUPED LINES be as per the manufacturers most recent
TO H.E'S DETAIL TO INDICATE
PANEL JOINTS
written recommendations.
Higher Parapet - Supply & install fire extinguishes to comply
with Australian Standards to the are of the
9.500 OVERFLOR SPITTER TO proposed work.
SI (ex) HYDRO. ENG. DETAIL
Lower Parapet - Termite Protection is to be provided to
8.600 comply with AS 3660.1-2000 and clarification to
be provided on completion.
SI (ex) - The construction and fit out of commercial
kitchens and bars is to comply with AS 4674-
DP (ex) DP 2004.
DP DP DP DP DP
6700
5800
Keynote Legend
Key Value Keynote Text
(ex)
BOL-F BOL-F
Ground FFL BOL-F Bollard Fixed
2.800 DP Downpipe
EXTERNAL TROLLEY PANEL HEIGHTS TO MATCH FH Fire Hydrant
CORAL BY BUILDER. EXISTING - COS
Proposed North Elevation REFER DETAIL. PCP Pump Control Panel
2 1 : 100 SI Signage
170 20 3055 20 5970
CONC. PANEL CONC. PANEL
20 3045 20 2905
NEW METAL PARAPET CAPPING GROUPED LINES TO INDICATE
PANEL JOINTS
6015 20 5995 20 150
Higher Parapet CONC. PANEL
20 2980 20 2995 20 150
9.500
NEW METAL PARAPET CAPPING
Lower Parapet
8.600
OVERFLOR SPITTER TO
HYDRO. ENG. DETAIL
DP (ex)DP
NEW DOWNPIPE AND SUMP DP
6700
TO H.E'S DETAIL
5800
5800
D NEW ROLLER SHUTTER
PCP 06
FH D RELOCATED GENERATOR
BOL-F 07
Ground FFL BOL-F
2.800
PANEL HEIGHTS TO MATCH
EXISTING - COS PANEL HEIGHTS TO MATCH
EXISTING - COS
Proposed West Elevation
3 1 : 100
2675 20 5355
CONC. PANEL CONC. PANEL
150 20 5995 20 6015
20 2675 20 2665
CONC. PANEL CONC. PANEL
NEW METAL PARAPET CAPPING NEW EAVES GUTTER TO H.E'S 150 20 2995 20 2980 20 2995 20 3000
DETAIL
Higher Parapet Higher Parapet 6 Minor Change MT 08.02.21
5 Pick-Up Amendments MT 28.09.20
9.500 9.500 4 Amendments MT 08.09.20
Lower Parapet 3 Pick-Up Amendments MT 24.08.20
Lower Parapet 2 Amendments MT 31.07.20
8.600 issue revision initials date
(ex)DP
8.600
DP
NEW METAL PARAPET CAPPING
Cayas
Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
6700
p 07 3356 6100 e [email protected]
5800
(ex)
NEW DOWNPIPES TO H.E'S client
DP DP ALH Group
4810
RN
GROUPED LINES TO INDICATE DETAIL G TAVE
EXISTIN
PANEL JOINTS
GROUPED LINES TO INDICATE
FH PANEL JOINTS project Villa Noosa Hotel - Dan
BOL-F RELOCATED
GENERATOR
Murphy's
Ground FFL Ground FFL
2.800 2.800
drawing title Proposed Elevations
PANEL HEIGHTS TO MATCH PANEL HEIGHTS TO MATCH NEW EAVES GUTTER TO H.E'S
EXISTING - COS EXISTING - COS DETAIL
Proposed South Elevation Proposed Liquor Dock East Elevation drawn JC
4 1 : 100 5 1 : 100 date April '19
scale 1 : 100@A1
project no. drawing number issue
1905 A20.01 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.