Skip to the record
Search everything, all in one place.

Original source · versioned page text

20220214 12 Wyandra St SWMP

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

plumbed to the tank. A low flow outlet consisting of a 43mm orifice plate in each tank is to be provided to the base
of the OSD storage of each tank, and a 100mm high flow outlet at the head of the tank will provide discharge for
larger storm events.

Using this mitigated development model, the proposed developed flows were again compared to the existing state
as shown below in Table 3.2 Existing and proposed mitigated site peak discharge rates.

                                Table 3.2 Existing and proposed mitigated site peak discharge rates

                                                                      Wyandra Street
                                                                                                     Qchange
                                           A.E.P               Qexisting   Qmitigated   Qchange       (%)
                                                               (m³/s)      (m³/s)       (m³/s)
                                            1EY                 0.021       0.021        0.000         0%
                                            50%                0.023        0.023       0.000          0%
                                           0.2 EY              0.035        0.033       -0.002         -6%
                                            10%                0.045        0.041       -0.004         -9%
                                             5%                0.052        0.051       -0.001         -2%
                                             2%                0.060        0.060       0.000          0%
                                             1%                0.065        0.065       0.000          0%



As the total peak flows are equal to or below the existing site conditions for all storm events, the proposed OSD area
will provide the mitigation required for the peak flow storm events from the development.




                                                                                                                 Page 9 of 15
Project number 20220214
File 20220214 12 Wyandra St SWMP.docx, 2022-09-14 Revision 1
P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads,Qld 4567             E [email protected]    recorconsulting.com
Log in to download the original file

20220214 12 Wyandra St SWMP.pdf · 12.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.