NOOSA COUNCIL IDAS Development Application Decision Notice                                                     6 of 12


29.   The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A
      with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
      clearance (headroom) at any point of 2.2m.
Frontage Works
30.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the James Street
      frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
      Grass shall be couch, free of weeds.

31.   A new 1.5m wide concrete path shall be constructed along the James Street and the Elizabeth Street
      frontages of the site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services. The path shall be constructed to connect to the two
      existing adjacent pram ramps on James Street and Elizabeth Street.

32.   All paths, pram ramps, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in
      accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access
      & Mobility.

33.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
      paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
      prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
34.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 5000 litres per dwelling) that is installed to ensure water from the tank is used for external uses
      (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to be
      designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the road Kerb in James and/or
      Elizabeth Street and/or the stormwater drainage system located at Elizabeth Street.

35.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
      drainage permitted to drain from the site shall be discharged to Council’s:
      35.1. Existing drainage structure in Elizabeth Street or/and,
      35.2. Existing kerb & channel street drainage system in James Street.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second.
      Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer and submitted
      to Council prior to obtaining a Development Permit for Operational Works.
36.   All site stormwater drainage shall be by means of a gravity system.

37.   All stormwater drainage lines to be Council’s assets and inter-allotment drainage shall be inspected by
      closed circuit television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
      satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
      inspection, including any additional inspection necessary following defect identification and rectification.
      This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
      rate basis current at the time of approval.

Sewer Mains
38.   The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

39.   A new branch of sewer main shall be constructed from the existing main located on Lot 2 RP69049 (no.
      40 Elizabeth Street). The new line and shall be constructed 1.5m north and parallel to the rear boundary
      of Lot 2 RP69049 at no cost to Council. The construction of two additional manholes will also be required.
      Negotiation with the owner/s and any need for compensation in this regards are the responsibility of the
      applicant.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]

Used in these records

About this file

File size
59 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E678.001.pdf · 59 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.