NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 12
If no agreement was reached between the two parties (ie the applicant and the owner/s of no. 40
Elizabeth Street) then the existing sewer connection (approximately 13m long) shall be upgraded to sewer
main standard at the applicant’s expense.
A Development Permit for Operational Works shall be required.
40. To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or within
1.5m of the centreline of any existing or proposed sewer main, whichever is the greater. As such the
applicant shall ensure the compliance of Operational Works plans and Building plans to this requirement
Easements for Sewer
41. A registered easement shall be created over the zone of influence of all existing and proposed sewers
within the subject site including sewer manholes and over those parts of the subject site that are impacted
upon by sewers on any adjoining sites. The easements shall generally be parallel to and centred over the
sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide overall. In this
regard a licensed surveyor shall accurately locate all sewer mains and determine the necessary width of
the easement, which shall be shown on any plans submitted for Operational Works / Building Works
approval. To this extent the surveyor shall certify that the sewer and the zone of influence is wholly
contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
42. No building or other structure shall be constructed or encroach over an easement.
Town Water Supply
43. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
44. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
45. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Where capable of being separately rated, each dwelling unit shall be served by individual water meter.
Earthworks
46. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural surface runoff. Detailed site surveys indicating the
existing surface levels and contours of the adjoining properties must be provided with the application for a
Development Permit for Operational Works for Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path within the
development site that caters for drainage from the adjoining sites for a design storm with an Average
Recurrence Interval of 1 in 100 years. A private easement for the Drainage of Water encompassing the
drainage pipes or overland flow-path will also be required. In this regard a Development Permit for
Operational Works shall be obtained.
Should evidence certified by a Registered Professional Engineer be provided to Council indicating that no
additional ponding of stormwater will occur on the adjoining properties the requirement for the drainage
pipes, overland flow-path and easement shall not apply.
47. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
structures that border the development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015E678.001.pdfRelated documentPublic source context ↗
SUPERSEDED Decision Notice - 010.2007.00000409.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 59 KB (small file)
- File type
No other editions are linked here.