NOOSA COUNCIL IDAS Development Application Decision Notice                                                 8 of 12


Acid Sulfate Soils
                                                                                         3
48.   As the site is located below the 5m AHD, any filling works consisting of 500m or greater and with an
      average depth of 0.5m or greater will need to be carried out in accordance with State Planning Policy 2/02
      Planning and Managing Development Involving Acid Sulfate Soils. In this regard appropriate testing and
      supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for
      approval prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
49.   Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
      control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
      waste, will be necessary.
      In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.

Contributions Towards Council Infrastructure
50.   Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
      various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
      amounts under the current Council policies and requirements is outlined in the table below:

        Contribution Required For:                                                            Amount:

        PSP12 – Public Open Space Contributions (Park)                                        $2,974
        PSP16 – Sewerage Headworks Contributions                                              $2,576
        PSP17 – Water Supply Headworks Contributions                                          $3,027
        PSP20 – Pathway Trunk Network Contributions                                           $669
        Stormwater Drainage Contributions in accordance with the Noosaville / Ward Park
                                                                                              $2,371
        Tewantin Master Drainage Plan
        TOTAL Contribution Amount =                                                           $11,617
        Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
        from June 2007 until the date of payment.
     All contributions must be paid prior to the issue of a Development Permit for Operational Works.
General
51.   For the following classes of work associated with development, a Development Permit for Operational
      Works must be obtained prior to commencement of works relating to that class of work. The application
      may combine any or all of these classes of work:-
      51.1.   Access and Carparking.
      51.2.   Stormwater Drainage.
      51.3.   Frontage Works.
      51.4.   Sewer reticulation (including new mains, relocations, diversions).
      51.5.   Site Filling.
      51.6.   Landscaping.
      51.7.   Erosion & Sediment Control
52.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure, which shall be submitted in
      conjunction with an application for a Development Permit for Operational Works. In this regard a
      DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
      with any application for Operational Works.

53.   Digital detailed designs including drawings, calculations, specifications and a schedule of works, shall be
      submitted with any application for a Development Permit for Operational Works. To facilitate production of
      As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and
      As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
      www.adac.com.au).

54.   A construction management plan/strategy to ensure no damage occurs to Council services shall be
      prepared by a suitably qualified Registered Professional Engineer and submitted to Council in conjunction
      with any application for Operational Works.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@1006ad04\@[email protected]

Used in these records

About this file

File size
59 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015E678.001.pdf · 59 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.