Appendix B - Code Compliance Tables
Attached to the e-mail Resort Drive, Noosa heads - Access Easement @ CTS Reconfiguration of a Lot - REC17/0022.
SPECIFIC OUTCOMES PROBABLE SOLUTIONS COMMENT
Complies – All services can be located above 1:100 year ARI.
Complies – No power easements located on-site.
Complies – no electricity substation within 50m.
Earthworks and Stormwater Management
Complies – Stormwater runoff will be managed in accordance with the
design approved under the associated multiple dwelling approvals.
The intended strategy is not intended to change as a consequence of
the proposed reconfiguration.