Original source · versioned page text
2020-09-08 S&O Agenda - Item 1 - Attachment 2 Delegations of Authority Council to Chief Executive (Updated)
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
DESCRIPTION OF POWER DELEGATED LEGISLATION
proper working order, a weighbridge (Nb. this obligation does not come into
operation until the day provided in section 8(2) of the Regulation). in
conducting a recycling activity prescribed by regulation, to make a residue
waste discounting application to the chief executive
Power, as the operator of a waste disposal site at which a weighbridge is Section 445
installed, to measure and record waste. the applicant for a residue waste
discounting application, to provide further information or documents for the
application if required by the chief executive.
Power to agree with the chief executive about extending the time for Section 45(2)
providing further information or documents for a waste residue discounting
application.
Power, as the holder of an approval of a discounted rate for the waste levy Section 49
for residue waste, to request an amendment of the approval, and agree with
the chief executive to the amendment of the approval.
Power, as the holder of an approval of a discounted rate for the waste levy Section
for residue waste, to make submissions in response to a notice from the chief 50(3)(e)
executive about cancelling or amending the approval.
Power, as the operator of a waste disposal site, to prepare a waste data Section 5352
return for each reporting period. receive and request delivery information for
waste.
Power, as the operator of a resource recovery and transfer facility, to receive Section 54
and request delivery information for waste.
Power, as the operator of a levyable waste disposal site, to pay the chief Section 56
executive the waste levy, including any interest.
Power, as the operator of a waste disposal site in the waste levy zone, to Sections 56
ensure a weighbridge is installed and operates at the site, is brought back and 57
into operation if out of operation, and give notice to the chief executive where
the weighbridge is out of operation and brought back into operation, as
required by sections 56 and 57.
NOTE: an exemption may apply until 30 June 2029 pursuant to chapter 16,
part 3, division 2.
Power to measure and record waste as required by sections 59, 60 and 61. Sections 59, 60
NOTE: an exemption may apply until 30 June 2029 pursuant to chapter 16, and 61
part 3, division 2.
Power, as the operator of a waste disposal site, to agree with the chief Section 60(3)
executive about an alternative way to measure and record the waste.
Power, as the operator of a waste disposal site and where the chief executive Sections 63,
has given Council a notice under section 63(2), to install, maintain and 64, 65 and 66
operate a monitoring system as required by the notice, and comply with
sections 64, 65 and 66.
Page 128 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.