ORDINARY MEETING MINUTES 16 FEBRUARY 2017
14. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Building Height
15. The maximum height of the development must not exceed RL 17.880m (AHD) as
shown on the approved plans for the development.
Performance Bond
16. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000.00
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Operational Works. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Council reserves the right to call upon the bond or guaranteed sum to effect compliance
with conditions.
Sunset Clause for Completion of Approved Development
17. Pursuant to s342 of the Sustainable Planning Act 2009, the uncompleted aspects of
this development approval lapses if the whole of the approved use has not happened
by 19 January 2021.
Building Appearance
18. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
Noise
19. The applicant is to implement all of the recommended acoustic treatments provided in
the Environmental Noise Impact Assessment, by CRG Acoustics, dated 11 July 2016,
as they relate to Stage 4 of the development. The applicant is to provide additional
noise attenuation for the smokers terrace area to prevent the reliance on staff having
to manage subdued patrons using this area. Further, the applicant is to provide suitable
sound attenuation for the bin storage area to reduce adverse noise impacts caused by
rubbish being placed in the bins. These additional sound attenuation measures are to
be certified by a suitably qualified and experienced noise expert.
20. The following specific acoustic treatments are to be applied to the building construction
and design as outlined in the CRG Acoustics Report of 11 July 2016:
a. Sound lock doors must be installed at the proposed smoker’s terrace as detailed
in the development application plans (Rubicon: Proposed Ground Floor Plans:
Stage 4 plan and Stage 5 & 6 plan).
b. Driveways, ramps and car park areas must be finished with surface coatings
which prevent tyre squeal (an uncoated surface is acceptable).
c. All drainage grating over trafficable areas must be secured in a way that prevents
rattling or nuisance noise.
d. Car park exhaust ducting is to have acoustic insulation before and after any right
angle bend (900) at the outlet end of the exhaust fan/s.
e. Car park exhaust discharge riser is to be lined with 50mm thick insulation
(hydrophobic fibreglass batts min. 32kg/m2 ) faced with perforated metal (min.
12% open face area)
Page 15 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.