Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Part 1 of 3 · OPW11/0335

of 20

Text shows just the words. Original shows the document exactly as it was published.

E
13           Is any of the operational work proposed to be carried out within a coastal management district?


      No

(] Yes           •        It is recommended that you complete part 10 of this checklist.


1.14         Is any of the proposed operational work for constructing or raising waterway barrier works under the
             Fisheries Act 1994?


FX_ No
fl Yes          I•        It is recommended that you complete part 11 of this checklist.

1.15         Is any of the proposed operational work to be carried out completely or partly within a declared fish
             habitat area under the Fisheries Act 1994?


      No

[] Yes                    It is recommended that you complete part 12 of this checklist.


1.16         Is any of the proposed operational work removing, destroying or damaging marine plants under the
             Fisheries Act 1994?

      No

fl Yes           •        It is recommended that you complete part 13 of this checklist.


1.17         Is any of the operational work proposed to be carried out in a wild river area declared under the Wild
             Rivers Act 2005?


Fx_ No
      Yes        .        It is recommended that you complete part 14 of this checklist.


1.18         Is any part of the premises located in part of a future state-controlled road or within 100 metres of a
             state-controlled road?

X No

      Yes        •        It is recommended that you complete part 15 of this checklist.


Part 2 - State-controlled roads
2.1          Is the proposed operational work for filling or excavating listed in the Sustainable Planning
             Regulation 2009 schedule 11 and does it exceed the threshold or combined threshold?


[X] No           •        End of part 2 of this checklist.
                 •        This application requires assessment by the Department of Transport and Main Roads as a
       Yes
                          concurrence agency.

             End of part 2 of this checklist.


Section reference:
•                Sustainable Planning Regulation 2009, schedule 7, table 3, items 1(b) and 2




                                                                                                              checklist 4
                                                                                                              tuber 2009

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Part 1 of 3.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.