Part 3 - Acid sulfate soils
3.1          Is the natural ground level of any point where work is being carried out less than 20 metres
             Australian Height Datum (AHD)?


EINo                    End of part 3 of this checklist.

q
x Yes


3.2          Does the proposed operational work involve the following?


excavating more than 1000 cubic metres of soil or sediment at or below five metres
                                                                                          q Yes           q
                                                                                                          x No
AHD
using more than 1000 cubic metres or more of material with an average depth of 0.5
                                                                                          q Yes           q No
metres on land, soil or sediment at or below five metres AHD

             If yes to any of the above, then this application requires assessment by the Department of Environment and
             Resource Management as an advice agency.


Section reference:
•       Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
•       State planning policy 2/02: planning and managing development involving acid sulfate soils, section 3.6


[Part 4 - Easements and Substations                                                                                  11
[4.1         Is the filling or excavation associated with reconfiguring a lot?

       No

N Yes           •       Go to question 4.5


4.5          Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
             I issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
             strategic pipeline?


 X No                    End of part 4 of this checklist.

F-1 Yes          •       This application requries assessment by the pipeline licence holder as an advice agency.

Section reference:
•            Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17


 Part 5 - Koala conservation

 5.1         Do any of the exceptions stated in section 1.4 of the SEQ Koala SPRP apply?


       No        •       End of part 5 of this checklist.

       Yes


 Section reference:
 •       Sustainable Planning Regulation 2009, schedule 7, table 2, item 38
 •       Sustainable Planning Regulation 2009, schedule 7, table 3, item 36
 •       South East Queensland Koala State planning regulatory provisions

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Part 1 of 3.pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.