Council archive · source document
Development Part 1 of 3 · OPW11/0335
Part 3 - Acid sulfate soils
3.1 Is the natural ground level of any point where work is being carried out less than 20 metres
Australian Height Datum (AHD)?
EINo End of part 3 of this checklist.
q
x Yes
3.2 Does the proposed operational work involve the following?
excavating more than 1000 cubic metres of soil or sediment at or below five metres
q Yes q
x No
AHD
using more than 1000 cubic metres or more of material with an average depth of 0.5
q Yes q No
metres on land, soil or sediment at or below five metres AHD
If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as an advice agency.
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
• State planning policy 2/02: planning and managing development involving acid sulfate soils, section 3.6
[Part 4 - Easements and Substations 11
[4.1 Is the filling or excavation associated with reconfiguring a lot?
No
N Yes • Go to question 4.5
4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number
I issued under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane
strategic pipeline?
X No End of part 4 of this checklist.
F-1 Yes • This application requries assessment by the pipeline licence holder as an advice agency.
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, items 9(a), 9(b) and 17
Part 5 - Koala conservation
5.1 Do any of the exceptions stated in section 1.4 of the SEQ Koala SPRP apply?
No • End of part 5 of this checklist.
Yes
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 38
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 36
• South East Queensland Koala State planning regulatory provisions
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Part 1 of 3Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.