                                                                                                2211-32227 SER



Attachment 1—Conditions to be imposed


 No.     Conditions                                                              Condition timing
 Operational work for prescribed tidal work (removal of existing pontoon and installation of new
 pontoon system)
 Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2, Item 1—Tidal works or work in a
 coastal management district —The chief executive administering the Planning Act 2016 nominates the
 Director-General of the Department of Environment and Science to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.      The development must be carried out generally in accordance with        At all times
         the following plan:

                 Site Plan, Layout Plan & Water Allocation, prepared by The
                  Jetty Specialist, dated 14/10/2022, drawing number TJS-
                  04772-01, revision A.
 2.      The structure must be lit/marked in accordance with the following       At all times
         specifications, such that it does not cause a risk to the safe
         navigation of other ships:

                 Section 3 of AS4282-1997 Control of the obtrusive effects of
                  outdoor lighting.
 3.      The construction, operation or maintenance of the structure, and any    At all times
         ship berthed, moored or attached to the structure, must not:

              (a) encroach into, pass over or under a navigation corridor, or
              (b) be located in a high risk maritime zone.
 4.      Any debris or similar obstruction generated whilst undertaking the      While works are
         work must be removed from the waterway and suitably disposed of         occurring
         at the applicant’s expense.
 5.      All piles and/or structures to be demolished, both above and below      Prior to the completion
         the waterline must be completely extracted/removed.                     of works




 State Assessment and Referral Agency                                                              Page 3 of 4
Log in to download the original file

Harle - Early referal Response.pdf · 729 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.