Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
To ensure the development is carried out generally in accordance with the plans of development
submitted with the application.
To ensure that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways.
To ensure the development does not encroach on the navigation corridor or high risk maritime
zone to ensure the safe passage of vessels.
To ensure that debris from the development does not create a hazard to navigation.
To ensure that there is no residual material that could create a hazard to navigation.
Findings on material questions of fact:
The proposed development is located in a canal.
The proposed development is for the construction of a private single vessel pontoon.
The proposed structure, including any vessel berthed, moored or attached to the structure:
will not encroach into, pass over or under a navigation corridor, and
is not located in a high risk maritime development zone.
Evidence or other material on which the findings were based:
Development application
State Development Assessment Provisions published SARA, version 3.0
Planning Act 2016
Planning Regulation 2017
SARA DA mapping system.
Human Rights Act 2019
State Assessment and Referral Agency Page 4 of 4