Skip to the record
Accept no imitations.

Original source · versioned page text

2016-11-08 S&O Agenda - Item 3, Attachment 1 - Local Economic Plan

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                       Financial Statements 2016



Noosa Shire Council

Notes to the Financial Statements
for the year ended 30 June 2016

Note 12. Fair Value Measurements (continued)



(1) The following table presents all assets and liabilities that have been measured and recognised at
   fair values:
                                                                              ~-a it V~h.:e
                                                                          Maasurement usin
                                                                           Leve!2         L~wel 3                              Total
                                                                                   Significa~l           Significant
                                                                                  observable       tJr.observable
                                                                                       i:op..;ts             inpu!s
2016                                                                                   $'000                 $'000                 $'000
Property, Plant and Equipment
· Land                                                                             68,769                61,340             130,109
· Buildings                                                                                              59,208              59,208
• Road and Bridge Network                                                                               528,147             528,147
- Storm Water                                                                                           114,774             114,774
•, _Other
    ... -
               Infrastructure Assets _ ,.r• - -- -
          . .- -_.....-- .. _................._ • • " ...
                                           • • ·--~-"''
                                                                                                          ~~80_             - ~·.8.80
Total Property, Plant and Equipment                                                                -- !i~_()J.~~            ~~!.1t~


2015
Property, Plant and Equipment
- Land                                                                             63,883                55,631             119,514
· Buildings                                                                                              60,383              60,383
- Road and Bridge Network                                                                               522,600             522 ,600
- Storm Water                                                                                           112,374             112,374
------.
   Other
      -............ __Infrastructure
                       _                    _
                                                       Assets
                      . . . _... .._._, ,._..., , ... ...... ... ,. _ ...                          -· ..?..?:.?~3          ...?.~.?9~
Total Property, Plant and Equipment                                                ~~!~~~          -    .~Q~.?~1            ~7?!164



(2) Transfers between Level1 and Level2 Fair Value Hierarchies

During the year, there were no transfers between Level 2 and Level 3 Fair Value hierarchies for recurring fair
value measurements.

Council's policy for determining transfers between Fair Value hierarchies is at the end of the reporting period.




                                                                                                                        page 23
Log in to download the original file

2016-11-08 S&O Agenda - Item 3, Attachment 1 - Local Economic Plan(PDF, 14MB).pdf · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.