Skip to the record
The gold standard in government transparency.

Original source · versioned page text

N13078 - 2014.10.17 - 1 Of 2

Attached to the e-mail OPW14/0197 - Amended Plans for Approval (Email 1 of 5)..

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

Zz

 
 
    
  
 
  
     
    
         
   
   
 
  

  
 

 

REFER N13078-130 FOR
BASIN EARTHWORK
LEVELS AND DETAILS.

901

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

     
  

   

LEGEND

PROPOSED STAGE BOUNDARY

© 15.50 PROPOSED FINISHED SURFACE LEVEL

PROPOSED BLOCKWORK RETAINING WALL

PROPOSED ROCK RETAINING WALL

PROPOSED CONCRETE SLEEPER WALL

EXISTING SURFACE CONTOUR
(0.5m INTERVAL)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ 82.0 DESIGN SURFACE CONTOUR
~~ ~~ (0,25m INTERVAL)
REFER N13078-129 FOR
BASIN EARTHWORK
LEVELS AND DETAILS. AREA OF FILL
AREA OF CUT
(1.00) DENOTES WALL HEIGHTS
NOTES
1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL
stow 15.57 EXISTING SERVICES WITH THE RELEVANT AUTHORITY BEFORE
73 — COMMENCING CONSTRUCTION.
— 60). 16.00 2, ALL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
TL ss CURRENT COUNCIL SPECIFICATIONS AND STANDARD DRAWINGS.
REFER N13078-128 FOR pa / 0-11.60
4 PN AAD NeRALS / H Lt ow.17.55 3. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS
. a) ax | AND FENCES FROM THE SITE TO THE SATISFACTION OF THE
Le | -7 Coe SUPERINTENDENT.
17.50" (4.50) 17.80.
ae eee Lm 4. NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING
Ay 19-08 719.30 SHOWN ON THE DRAWINGS, THE ACTUAL LIMITS SHALL BE
iF Ba tow 19.16 DETERMINED ON SITE BY THE SUPERINTENDENT DURING
I CONSTRUCTION. SIMILARLY, THE FINISHED SURFACE LEVELS
4 MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE
J SUPERINTENDENT DURING CONSTRUCTION AFTER AMENDED
/ DRAWINGS HAVE BEEN APPROVED BY COUNCIL.
/
46
a LY 7 feo 22.48
80. |} ~\ 7d
121,30 | 21.30 108 J 21.808
3.0m FIRE PROTECTION ZONE |: A 20g YZ 2
PRIVATE OPEN SPACE BUFFER
3.0m FIRE PROTECTION zone!
STAGE C1 PRIVATE OPEN SPACE BUFFER
FILE; N13078-107.dwq DATE: 16-10-2014 TIME: 14:24
Xref's: X-N13078-TIT X-N13078-BASE X-N13078-BULK EARTHWORKS X-N13078-CONTOURS X-N13078-CUT-FILL USR: Curtis Beorman
Tar [once non SORE CMETREST TICTOPTNT Nr STENT DRAWING TLE
AMENDMENT DETAILS DESIGN CHECK SURVEYOR: RPS
Uk arf [sc acts ROW TOE RT WAL TEAR I INNOVATION PARKWAY, BIRTINYA QM PROPERTIES 4 cour aur BULK EARTHWORKS
a Ph (07) 5436 7888 Fax’ (07) 5493 6630 LAYOUT PLAN
Es @_| Ce | W.A0% [Bio BASNS & REAR LOT AMENDED 1500 1 5 0 0 Al PROGECT
ble DRAWN CHECK] ———— PROWECT Wo. "APPROVED SHAUN PILCHER RPEQ 14593 Brown Consutng (QLD) Pty Lid ay SHEET 1 OF 3
Np ‘1000 a3 Z MATHEW HILL RPEQ 1578 LAKE DOONELLA NOOSA ‘ Uo 1 ena, in OD A 45
NE N13078 Poe BRENT THOMAS RPEO 160 STAGE C1 - C6 Smart Consulting ee are, Canary | Prawne MOMBER N12078-107 >
Slr FOR & ON BEHALF GF BROWN CONSULTING (QLD) PTY LTD (Mrotane Conbarm Mehours Spivey rgepere Sunetine Cemt Lc 484

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Log in to download the original file

N13078 - 2014.10.17 - 1 OF 2.pdf · 9.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.